I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-03.3(7) Disposal of Surplus Material <br /> 2-03.3(7)C Contractor-Provided Disposal Site <br /> Delete the first paragraph of 2-03.3(7)C and substitute the following: <br /> Make arrangements for disposal of surplus and other materials. All costs for <br /> disposal of surplus and other materials shall be included with the respective <br /> Bid items of the Contract with no direct compensation being made. <br /> Dispose of Asbestos-cement pipe in accordance with the requirements of the <br /> State of Washington Department of Ecology and the Snohomish County Solid <br /> Waste Division. <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: 1 <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid items Descriptions and provided in Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. , <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for"Proof Rolling" as required in this section , <br /> for excavated portions of the roadway and the Contractor shall include costs in his <br /> various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials I <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> Imported material required in this section shall be paid for by the unit Bid price for that <br /> material. Payment for placement and compaction of import material shall be included in <br /> the unit price per ton of import material. <br /> 2-04 HAUL <br /> 2-04.1 Description I <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its final <br /> place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant <br /> Revise 2-04.3 to read as follows: <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04.4 Measurement <br /> Revise 2-04.4 to read as follows: <br /> Haul work will not be measured. I <br /> Cleveland Avenue Division 2—EARTHWORK November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No. UP3398 SP-158 <br />