Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-09 STRUCTURE EXCAVATION <br /> 2-09.2 Materials , <br /> Supplement 2-09.2 by adding the following at end of the materials list: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> 2-09.3 Construction Requirements <br /> 2-09.3(1) General Requirements <br /> 2-09.3(1)C Removal of Unstable Base Material <br /> Delete all paragraphs in 2-09.3(1)C and substitute the following: <br /> When the material at the bottom of an excavation is not stable enough to <br /> support the Structure, the Contractor shall excavate below grade to the depth <br /> required by the Engineer and replace the unstable material with Foundation <br /> Material Class A or B. <br /> Place Foundation Material Class A or B in layers not more than six inches thick <br /> and compact to minimum of 90-percent maximum density as determined by 2- <br /> 03.3(14)D. <br /> Dispose of unsuitable material removed to make room for foundation material <br /> by hauling tc a waste site obtained and provided by the Contractor in <br /> accordance with 2-03.3(7)C. <br /> 2-09.3(1)D Disposal of Excavated Material <br /> Delete the second paragraph in 2-09.3(1)D and substitute the following: 111 <br /> All costs for disposing of excavated material, whether within the Project limits <br /> or hauled to a disposal site, shall be incidental to the other Bid items in the <br /> Proposal. The City will not pay for hauling. Disposal of excavated material shall <br /> meet the requirements of 2-03.3(7)C. <br /> 2-09.3(1)E Backfilling <br /> Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br /> strength not to exceed 300-psi. Provide wet or flowable CDF with consistency <br /> having approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. <br /> Use wet, or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material; <br /> gravel borrow, washed sand or crushed surfacing top course, the respective <br /> limits for trench width or backfill dimensions shall be approved by the inspector. <br /> 2-09.3(3)B Excavation Using Open Pits — Extra Excavation <br /> Revise the sixth paragraph to read as follows: <br /> Submittals and Design Requirements—The Contractor shall submit Type 3E <br /> Working Drawings with supporting calculations showing the geometry and <br /> construction sequencing of the proposed excavation slopes. <br /> 2-09.3(3)D Shoring and Cofferdams <br /> Revise the fifth paragraph to read as follows: <br /> Submittals and Design Requirements—The Contractor shall submit Type 3E <br /> Working Drawings with supporting calculations showing the proposed methods <br /> Cleveland Avenue Division 2—EARTHWORK November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No. UP3398 SP-160 <br />