My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-04.5 Payment <br /> Revise 2-04.5 to read as follows: <br /> All costs for the Work described in Section 2-04 shall be included with excavation work <br /> with no direct compensation made. <br /> ' 2-07 WATERING <br /> 2-07.3 Construction Requirements <br /> ' Supplement 2-07.3 by adding the following: <br /> Only Everett Public Works Department Water Division personnel and the Project <br /> Inspector may authorize the operation of City fire hydrants or making connections to City <br /> water mains. Upon obtaining City permission, the following shall apply: <br /> 1 Use only those agency designated hydrants in strict accordance with City's <br /> requirements for hydrant use. Obtain a temporary hydrant permit from the <br /> ' City's Public Works Department Water Division. Temporary hydrant permits are <br /> available for a$1,200.00 deposit by contacting the City of Everett's Utility Billing <br /> at 425-257-8999 from 8:00 a.m. to 5:00 p.m. Monday through Friday. Deposit <br /> is refundable. Provide backflow prevention assembly approved by the City. <br /> 2. Secure permission from and comply with all requirements of the City's water <br /> utility before obtaining water from the fire hydrants. Notify the Engineer of City's <br /> permission as soon as granted. <br /> 3. Use hydrant wrenches only to open hydrants. Make certain the hydrant valve <br /> is fully open because "cracking" the hydrant valve causes damage to the <br /> hydrant valve. Provide an approved auxiliary valve on the outlet line for control <br /> purposes. Close fire hydrant valves slowly to avoid a surge in the system that <br /> creates excess pressure on water lines. Carefully note the importance of <br /> following these directions. <br /> 4 If Contractor's employees use the wrong wrench to open a hydrant causing <br /> damage the hydrant valve stem or operating nut or both, the Contractor shall <br /> be responsible for costs associated with repairing the damaged hydrant valve <br /> stem or operating nut or both. Immediately notify the City's water utility so that <br /> the damage can be repaired as quickly as possible. <br /> 5. Notify City water utility immediately upon completing the use of the hydrants so <br /> the hydrants may be inspected for possible damage. City water utility will repair <br /> damage resulting from the use of the hydrants by the Contractor. Contractor <br /> shall he responsible for repair cost and cost, if necessary, shall be withheld <br /> from the final payment to the Contractor. <br /> 6. City water utility will fine Contractor for violation of these requirements. <br /> Contractor shall also be liable for damage suits resulting from malfunctioning <br /> of Contractor damaged fire hydrants not being operational in the event of fire. <br /> 7. There will be no charge for the volume of water used. <br /> 2-07.4 Measurement <br /> Revise 2-07.4 to read as follows: <br /> Water will not be measured. <br /> 2-07.5 Payment <br /> Revise 2-07.5 to read as follows: <br /> All costs for the Work described in Section 2-07 shall be included with the Work with no <br /> direct compensation made. <br /> ' Cleveland Avenue Division 2—EARTHWORK November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> Work Order No. UP3398 SP -159 <br />