My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 — DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> ' WATER MAINS, AND CONDUITS <br /> 7-04 STORM SEWERS <br /> ' 7-04.1 Description <br /> Revise the first paragraph in 7-04.1 to read as follows: <br /> This Work consists of constructing storm sewers to lines and grades as shown on the <br /> ' Plans and in accordance with COE Standard Drawings, the Standard Specifications and <br /> these Special Provisions. <br /> Supplement 7-04.1 as follows: <br /> 7-04.1(1) Submittals <br /> (******) <br /> ' Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-04.2 Materials <br /> Delete the first and second paragraphs in 7-04.2 and substitute the following: <br /> Materials shall meet the requirements of the following sections: <br /> Reinforced Concrete Storm Sewer 9-05.7(2) Standard Specifications <br /> Pipe <br /> Concrete Storm Sewer 9-05.7(3) Standard Specifications <br /> Pipe Joints <br /> ' Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br /> & Joints <br /> Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br /> ' & Joints <br /> Corrugated Polyethylene Storm 9-05.20 Standard Specifications <br /> Sewer Pipe & Joints <br /> ' Ductile iron Pipe 9-05.13 Standard Specifications <br /> Pipe <br /> Revise the last paragraph in 7-04.2 to read as follows: <br /> When schedule A or B storm sewer pipe is specified in the Plans, provide the specified <br /> schedule and diameter of either concrete, PVC, or PE/PP materials shown in the Storm <br /> Sewer Pipe Schedules Table. <br /> Contact the Olympia Service Center Materials Laboratory to determine if joints have <br /> been approved for pipe diameters larger than those listed. <br /> ' On the web at: http:Ilwwrv.wsdot.wa.gcv/biz/mats!QPL/QPI.cfm <br /> Or by mail at: <br /> ' P.O. Box 167 <br /> Olympia, WA 98507-0167 <br /> (360) 709-5442 <br /> ' 7-04.4 Measurement <br /> Delete the first paragraph of 7-04.4 and substitute the following: <br /> ' Cleveland Avenue Division 7-DRAINAGE STRUCTURES, November 2018 <br /> Sewer System Replacement and STORM SEWERS, SANITARY SEWERS, <br /> Storm Water Separation WATER MAINS,AND CONDUITS <br /> Work Order No. UP3398 SP -169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.