Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-04.5 Payment <br /> Delete all paragraphs in 7-04.5 and substitute the following: ' <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> i n 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> ecifications.o p <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS <br /> 7-05.1 Description 1 <br /> Revise the first paragraph in 7-05.1 to read as follows: <br /> This Work consists of constructing manholes, inlets, drywells, and catch basins and <br /> connecting to existing Structures of the types and sizes designated in accordance with <br /> the Plans, these Special Provisions, the Specifications, and the COE Standard <br /> Drawings, in conformity with the lines and grades staked. <br /> Further supplement 7-05.1 as follows: <br /> 7-05.1(1) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> Mortar, nonshrink 9-20.3(2) Standard Specifications <br /> Commercial Concrete 5-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-05.30 Special Provisions <br /> Flexible Couplings 9-05.40 Special Provisions <br /> Polypropylene Manhole Steps 9-05.64 Special Provisions <br /> & Hand Holds <br /> Polypropylene Manhole Ladder 9-05.66 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br /> Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br /> accordance with manufacturer recommendations and applicable City standards and <br /> details. <br /> Coordinate manhole cover and frame hinge location with manhole steps and traffic <br /> lanes. Hinge orientation to be determined during the shop drawing review of precast <br /> manhole structures. <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the eleventh paragraph in 7-05.3 to read as follows: <br /> Provide Kor-N-Seal, or equal, watertight flexible pipe to manhole connectors for pipes <br /> up to 48-inch diameter connecting to new sanitary sewer manholes. Place no pipe joint <br /> in PVC or HDPE pipe within 10-feet of the outside face of the manhole. <br /> Cleveland Avenue Division 7—DRAINAGE STRUCTURES, November 2018 <br /> Sewer System Replacement and STORM SEWERS,SANITARY SEWERS, <br /> Storm Water Separation WATER MAINS,AND CONDUITS <br /> Work Order No. UP3398 SP -170 <br />