My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-04.5 Payment <br /> Delete all paragraphs in 7-04.5 and substitute the following: ' <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> i n 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> ecifications.o p <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS <br /> 7-05.1 Description 1 <br /> Revise the first paragraph in 7-05.1 to read as follows: <br /> This Work consists of constructing manholes, inlets, drywells, and catch basins and <br /> connecting to existing Structures of the types and sizes designated in accordance with <br /> the Plans, these Special Provisions, the Specifications, and the COE Standard <br /> Drawings, in conformity with the lines and grades staked. <br /> Further supplement 7-05.1 as follows: <br /> 7-05.1(1) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> Mortar, nonshrink 9-20.3(2) Standard Specifications <br /> Commercial Concrete 5-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-05.30 Special Provisions <br /> Flexible Couplings 9-05.40 Special Provisions <br /> Polypropylene Manhole Steps 9-05.64 Special Provisions <br /> & Hand Holds <br /> Polypropylene Manhole Ladder 9-05.66 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br /> Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br /> accordance with manufacturer recommendations and applicable City standards and <br /> details. <br /> Coordinate manhole cover and frame hinge location with manhole steps and traffic <br /> lanes. Hinge orientation to be determined during the shop drawing review of precast <br /> manhole structures. <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the eleventh paragraph in 7-05.3 to read as follows: <br /> Provide Kor-N-Seal, or equal, watertight flexible pipe to manhole connectors for pipes <br /> up to 48-inch diameter connecting to new sanitary sewer manholes. Place no pipe joint <br /> in PVC or HDPE pipe within 10-feet of the outside face of the manhole. <br /> Cleveland Avenue Division 7—DRAINAGE STRUCTURES, November 2018 <br /> Sewer System Replacement and STORM SEWERS,SANITARY SEWERS, <br /> Storm Water Separation WATER MAINS,AND CONDUITS <br /> Work Order No. UP3398 SP -170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.