Laserfiche WebLink
The unit price per ton for crushed surfacing base course shall be full compensation for all labor, <br /> compaction, material, incidentals, tools, and equipment necessary to furnish, haul, stockpile, <br /> place, grade, and compact imported crushed surfacing base course for the work as required, <br /> ' from a Contractor supplied source in accordance with the Standard Specifications, Special <br /> Provisions and these specifications. <br /> ' The unit price for crushed surfacing base course also includes all costs for controlling moisture <br /> content. <br /> Also included in this bid item shall be the cost of grader work, or any other equipment required <br /> to remove existing soils to attain proper elevations, compaction of native subgrade soils, as well <br /> as all equipment required to spread and compact the crushed surfacing uniformly. <br /> During dry periods, the Engineer may require water sprinkling prior to placement of the crushed <br /> surfacing and while spreading and compacting the material. The cost of such sprinkling shall be <br /> included in the unit price bid for crushed surfacing. <br /> Measurement for crushed surfacing base course shall be limited to dimensions defined in the <br /> ' work descriptions for other bid items, shown on the plans, details or Standard Plans or as <br /> otherwise approved by the Engineer. Measurement for Crushed Surfacing Base Course shall be <br /> made for pipe zone bedding for combined sewer pipe, storm drain pipe, side sewer connections <br /> and for the preparation of bases for manhole structures, catch basins and inlets and for all other <br /> Work identified on the Plans, details and COE Standard Drawings. Crushed Surfacing Base <br /> Course material placed shall not exceed "neatline" quantities without advance authorization by <br /> the inspector. <br /> Payment for crushed surfacing g base course will be by the ton as recorded on certified weight <br /> tickets per Section 1-09.1 and as approved by the Inspector. <br /> Bid Items A-17 and B-17- HMA - CL 1/2"PG 64-?2 <br /> ' Specification Section 5-04 <br /> Measurement and Payment: Unit Price per Ton <br /> 1 The unit price per ton for HMA - CL 1/2"PG 64-22 shall be full compensation for permanent <br /> machine-placed asphalt concrete pavement surfaces including streets, alleys, street overlays, <br /> street crossings, and driveway aprons as shown on the Contract Plans. This bid item should be <br /> ' used for machine-placed asphalt pavement work where indicated on the plans. Only solo dump <br /> trucks may be used in the area of the project. <br /> ' The unit price for this bid item shall include ail labor, materials, equipment and incidentals <br /> necessary to furnish, machine-place, compact, roll and perform density tests on single or <br /> multiple lifts of HMA-CL %2"PG 64-22. A nominal compacted lift of HMA- CL 1/2"PG 64-22 <br /> shall not exceed 0.30-feet. <br /> Cleveland Avenue Division B-BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-37 <br />