Laserfiche WebLink
I <br /> The unit price bid per cubic yard for Controlled Density Fill (CDF) shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary and incidental to furnish, <br /> deliver, and place the CDF in accordance with the Standard Specifications, Special Provisions <br /> and Contract Plans. <br /> CDF shall be used for backfill at locations defined by Section 7-08.3(3) of the Special , <br /> Provisions. <br /> Where CDF is used in lieu of other materials such as foundation material, gravel borrow, <br /> washed sand or crushed surfacing top course, the respective limits for trench width or backfill <br /> dimensions shall be approved by the Engineer. <br /> Bid Items A-15 and B-15— CRUSHED SURFACING TOP COURSE <br /> Specification Section 4-04 1 <br /> Measurement and Payment: Unit Price per Ton <br /> The unit price per ton for crushed surfacing top course shall be full compensation for all labor, <br /> material, incidentals, tools, and equipment necessary to furnish, haul, stockpile, place, grade, <br /> and compact imported crushed surfacing top course for the work as required, from a Contractor <br /> supplied source in accordance with the Standard Specifications and these Special Provisions. <br /> Only solo dump trucks may be used in the area of the project. I <br /> The unit price for crushed surfacing top course also includes all costs for controlling moisture <br /> content. ' <br /> Also to be included in this bid item shall be the cost of grader work, or any other equipment <br /> required to remove existing soils to attain proper elevations, as well as all equipment required to <br /> spread and compact the crushed surfacing uniformly. <br /> During dry periods, the Engineer may require water sprinkling prior to placement of the crushed , <br /> surfacing and while spreading and compacting the material. The cost of such sprinkling shall be <br /> included in the unit price bid for Crushed surfacing. <br /> Measurement for Crushed Surfacing Top Course shall be by the ton, recorded on certified <br /> weight tickets per Section 1-09.1 for Crushed Surfacing Top Course placed within the limits of 111dimensions defined in the Work, descriptions for other Bid Items, shown on the Plans, details or <br /> COE Standard Drawings, or as otherwise approved by the Engineer. Crushed Surfacing Top <br /> Course material placed shall not exceed "neatline" quantities without advance authorization by <br /> the Inspector. , <br /> Payment for Crushed Surfacing Top Course will be by the ton as recorded on certified weight <br /> tickets per Section 1-09.1 and as approved by the Inspector. I <br /> Bid Items A-16 and B-16 — CRUSHED SURFACING BASE COURSE <br /> Specification Section 4-04 <br /> Measurement and Payment: Unit Price per Ton <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-36 , <br />