My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Bid Item B-19 - SOLID WALL STORM DRAIN PIPE, 4-INCH DIAM. PVC D3034 SDR 35 <br /> Bid Item B-20 - SOLID WALL STORM DRAIN PIPE, 6-INCH DIAM. PVC D3034 SDR 35 <br /> Bid Item B-21 - SOLID WALL STORM DRAIN PIPE, 8-INCH DIAM. PVC D3034 SDR 35 <br /> I Bid Item B-22 - SOLID WALL STORM DRAIN PIPE, 12-INCH DIAM. PVC D3034 SDR 35 <br /> Bid Item B-23 - DUCTILE IRON PIPE, 8-INCH DIAM. <br /> Bid Item B-24- DUCTILE IRON PIPE, 12-INCH DIAM. <br /> Bid Item B-25- CORRUGATED POLYPROPYLENESTORM SEWER PIPE, 18-INCH DIAM. <br /> Bid Item B-26 - CORRUGATED POLYPROPYLENESTORM SEWER PIPE, 24-INCH DIAM. <br /> Specification Section 7-04 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price per linear foot bid for the Storm Drain Pipe shall be full compensation for all labor, <br /> material, incidentals, tools and equipment necessary to satisfactorily complete the work as <br /> defined in these Special Provisions and as shown on the Plans. <br /> The unit price per linear foot bid for the Storm Drain Pipe shall be full pay for furnishing, hauling, <br /> and assembling in place the completed installation, including all wyes, tees, cleanouts, special <br /> fittings, joint materials and adjustment of inverts to inlets, connections to catch basins and <br /> manholes or combined sewer main for the completion of the installation to the required lines and <br /> grades. <br /> t Removingand disposing of existingstorm drain piping is incidental. <br /> P 9 pp 9 <br /> All costs in jointing dissimilar types of storm drain pipe with a coupling, adapter or concrete <br /> collar shall be included in the unit price for this bid item. <br /> ' Excavation, stockpiling, hauling and dewatering is incidental and shall be included in the unit <br /> price for this bid item. <br /> 111 The costs for pot-holing and excavation required to determine exact depths and locations of <br /> other utilities and installing Ethafoam pads between pipe and utilities, shall be considered as <br /> 1 incidental to the work and these costs shall be included in the unit contract price. <br /> Measurement and payment will be based on horizontal length of storm drain pipe constructed. <br /> ' Bid Item B-27 - CATCH BASIN, TYPE 1 <br /> ' Bid Item B-28 - CATCH BASIN, TYPE 2, 48-INCH DIAM. <br /> Bid Item B-29 - CONCRETE INLET <br /> Specification Section 7-05 <br /> Measurement and Payment: Unit Price per Each <br /> Cleveland Avenue Division B-BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.