My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The unit price bid item for each Catch Basin Inlet shall be full compensation for all labor, <br /> material, incidentals, tools and equipment necessary to satisfactorily complete the work as <br /> defined in these Special Provisions and as shown on the Plans. <br /> The unit price for each Catch Basin Inlet shall be full pay for furnishing, hauling, and assembling <br /> in place the completed installation including all catch basin inlets, drainage grates, pipe <br /> connections, special fittings, joint materials and adjustment of inverts to catch basin inlets for the <br /> completion of the replacement of storm drainage features impacted by construction activities to <br /> the required lines and grades. <br /> The cost of removing existing catch basin inlet structure or abandoning is considered incidental <br /> to the cost of the new catch basin inlet. <br /> Excavation, stockpiling, hauling, dewatering, and backfill are incidental and shall be included in <br /> the unit price for this bid item. <br /> Adjusting all catch basin inlets to final grade is incidental and shall be included in the unit price <br /> for this bid item. <br /> The cost of connection of storm drain pipes to the catch basin inlet, except for drop connections, <br /> is incidental and shall be included in the unit price for this bid item. <br /> Measurement and payment shall be per each catch basin inlet installed as measured upon , <br /> completion. <br /> Bid Item A-19 — MANHOLE 48-INCH DIAM., TYPE 1 , <br /> Bid Item A-20— MANHOLE 72-INCH DIAM., TYPE 3 <br /> (SSMH315 — CONTROL STRUCTURE WITH WEIR) <br /> Bid Item A-21 — MANHOLE 72-INCH DIAM., TYPE 1 <br /> (SSMH805 — CONTROL STRUCTURE WITH WEIR) <br /> Specification Section 7-05 ' <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each manhole shall be full compensation for all labor, material, tools and I <br /> equipment necessary to satisfactorily complete the work as defined in the Standard <br /> Specifications, Standard Plans, these specifications and as shown on the Plans. <br /> The Contractor shall provide and install all manhole components and accessories, including <br /> ductile iron manhole frames and covers per COE Standard Drawings. , <br /> The initial sawcutting, removing and disposing of existing pavement, sidewalks and curbs is <br /> incidental. , <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.