Laserfiche WebLink
I <br /> The unit price per linear foot of PVC sewer pipe shall be full pay for furnishing, hauling, and <br /> assembling in place the completed installation including all wyes, tees, special fittings,joint <br /> materials and adjustment of inverts to manholes for the completion of the installation to the <br /> required lines and grades. <br /> The initial sawcutting of pavement, and removing and disposing of existing pavement, sidewalks <br /> and curbs is incidental. <br /> The unit price of PVC sewer pipe shall also include, but not be limited to, all costs for trench <br /> excavation, removing and disposing of existing sewer pipe and existing manholes, hauling and <br /> disposing of surplus material, dewatering, furnishing, stockpiling, hauling, placing and <br /> compacting suitable native backfill, cleaning and flushing pipes and existing structures, testing <br /> and inspecting pipe, connecting pipe to and rechanneling of existing structures, reconnecting <br /> existing sanitary sewer, and replacing, protecting and maintaining utilities. Furnishing, hauling <br /> and placing of pipe zone bedding material (Crushed Surfacing Base Course) shall be paid under <br /> "Crushed Surfacing Base Course." <br /> All costs in jointing dissimilar types of sewer pipe with a coupling, adapter, or concrete collar <br /> shall be included in the unit price for this bid item. <br /> Measurement shall be linear feet of pipe, measured horizontally from station to station and will ' <br /> include the length through bends, tees and fittings. The Contractor will be responsible for <br /> providing sufficient materials for"true length" accounting for vertical change in pipe position. <br /> Measurement and payment will be based on horizontal length of sewer pipe constructed. <br /> Bid Item A-27 —SIDE SEWER CONNECTION <br /> Specification Section 7-18 <br /> Measurement and Payment: Unit Price per Each ' <br /> The unit price per each side sewer connection shall be full compensation for ail labor, material, <br /> tools and equipment necessary to satisfactorily complete the work as defined in Section 7-18 of <br /> these Special Provisions and as shown on the Plans. <br /> Included in this bid item is locating the existing side sewer, replacing the side sewer as shown 1 <br /> on the Contract Plans, connection to the main pipe and existing side sewer, fittings per Plan <br /> Details and COE Standard Drawings. <br /> Included in this bid item are all costs for trench excavation, removing and disposing of pavement <br /> sidewalk, curb, miscellaneous surfacing, landscape materials or sod, removing and disposing of <br /> existing side sewer pipe; hauling and disposing of surplus or unsuitable materials; excavation; <br /> dewatering; sewage bypassing; stockpiling, hauling, cleaning and flushing pipes; testing and <br /> inspecting and replacing; protecting and maintaining adjacent utilities. <br /> 1 <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-44 ' <br />