My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All costs in jointing dissimilar side sewer pipe with a coupling or concrete collar shall be included <br /> in the unit price for this bid item. <br /> Restoration of private improvements in streets and private property affected by side sewer <br /> ' construction and not otherwise included in other bid items, shall be considered incidental to this <br /> bid item. Except, where restoration of private improvements listed in item 1 under of Force <br /> Account Bid Item, and as authorized by the Engineer, that restoration work will be done by <br /> Force Account. <br /> Measurement for pay width of gravel borrow for trench backfill shall not exceed that necessary <br /> to meet trench safety requirements, COE Standard Drawings or Plan Details, whichever is <br /> greater. <br /> ' Bid Items A-28 and B-38 —TEMPORARY BYPASS PUMPING <br /> Specification Section 7-21 <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item for Temporary Bypass Pumping shall be full compensation for materials, <br /> work, labor and equipment necessary to furnish, install, and maintain temporary facilities <br /> ' necessary to maintain the continual wastewater flow and to prevent wastewater discharge to the <br /> environment throughout the duration of constructing new or rehabilitating existing sanitary sewer <br /> or combined sewer mains, or both, within the Project. <br /> Bid Items A-29 and B-39 — TEMPORARY SEDIMENTATION AND EROSION CONTROL <br /> ' Specification Section 8-01 <br /> Measurement and Payment: Lump Sum <br /> ' The lump sum bid item for Temporary Erosion and Sedimentation Control, shall be full <br /> compensation for materials, work, labor and equipment necessary to provide erosion control, <br /> complete and in place throughout the term of the Contract including preparing the Stormwater <br /> ' Pollution Prevention (SWPP) plan and implementing; providing the erosion and sediment control <br /> (ECS) lead to implement and update the TESC plan; and all costs for temporary and permanent <br /> erosion control measures needed to prevent silt from entering the storm drain, trenches or water <br /> courses or surrounding property as required in permits or as necessitated by current field <br /> ' conditions, climate, weather conditions and the Contractor's activities. <br /> Included in the lump sum price for this bid item are all costs for additional temporary erosion <br /> ' control measures which may be required to support the Contractor's construction methods, <br /> including but not limited to, settling and filtering of water from dewatering operations, catch <br /> basin inserts, diversion and control of surface runoff into or out of trenches, street cleaning, <br /> including sweeping and washing, straw mulch, protection of delivered or stockpiled backfill <br /> materials, protection of unsuitable or surplus materials and control, care and cleanup of <br /> petroleum products or other construction byproducts. <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.