My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 - GENERAL REQUIREMENTS <br /> Supplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> Work being performed includes furnishing all labor, materials and equipment necessary to <br /> construct new pipe conveyance system to separate, collect. and treat stormwater from <br /> existing combined sewer system; rehabilitate and replace existing combined sewer collection <br /> systems; and street/sidewalk restoration. Project involves construction of approximately <br /> 6.000 LF of new storm drainage pipe (4-inch to 24-inch dia.) with approximately 61 catch <br /> basin and manhole structures and approximately 10 water quality treatment structures. <br /> Construction of approximately 5,300 LF of existing combined sewer replacements (8-inch to <br /> 12-inch dia.)with approximately 32 manhole structures (48-inch to 72-inch)and reconnection <br /> of 108 existing side sewers; asphalt street restoration; curb, gutter, sidewalk, and curb ramp <br /> reconstruction; and other such appurtenances and performing all Work as required by the <br /> Contract, in accordance with the Contract Plans and Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located on alley way situated west of <br /> E Grand Avenue from 26th Street to 20th Street; Cleveland Avenue from 26th Street to 21st <br /> Street; alley way situated west of Cleveland Avenue from north of 26th Street to 24th Street; <br /> alley way situated west of Harrison Avenue from north of Everett Avenue to north of 25th <br /> Street; Summit Avenue from California Street to 26th Street: California Street from Summit <br /> Avenue to Harrison Avenue; alley way situated north of California Street from east of <br /> 1 Interstate-5 to west of Harrison Avenue;AND alley way situated north of Everett Avenue from <br /> east of Interstate-5 to Harrison Avenue. <br /> Design Engineer <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> attention of Dave Voigt, City Project Manager, DVoigt©everettwa.gov. <br /> Standard Specifications <br /> All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> Documents. These Specifications are incorporated by reference, made a part of this Contract <br /> and shall control and guide all activities within this Project whether referred to directly, <br /> paragraph by paragraph. <br /> WSDOT/APWA "2018 Standard Specifications for Road, Bridge and Municipal <br /> Construction," as amended by the APWA Supplements, hereinafter referred to as the <br /> "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the <br /> Standard Specifications and these Special Provisions, all of which are made a part of the <br /> Contract Documents, shall govern all of the Work. The following latest edition of other <br /> specifications and standard plans shall apply to the extent to which they are called out in <br /> these Plans and Special Provisions. <br /> I1. City of Everett "Design and Construction Standards and Specifications," latest <br /> edition as found on the Web at "http://everettwa.gov/DocumentCenter/View/243." <br /> 2. "Standard Plans for Road and Bridge Construction," as prepared by WSDOT. <br /> Cleveland Avenue Division 1 -GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> 1 WO No. UP3398 SP-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.