Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> standards of apprenticeship under chapter 49.04 RCW for the one-year period <br /> I immediately preceding the date of the bid solicitation, <br /> 1-02.1(2) Supplemental Bidder Responsibility Criteria <br /> (******) <br /> I This Project will not be subject to supplemental bidder responsibility criteria. <br /> 1-02.2 Plans and Specifications <br /> Delete all paragraphs in 1-02.2 and substitute the following: <br /> IInformation as to where Bid Documents can be obtained or reviewed will be found in the <br /> Call for Bids (Advertisement for Bids) for the Work. <br /> I 1-02.4 Examination of Plans, Specifications, and Site of Work <br /> 1-02.4(1) General <br /> Delete the fifth paragraph of 1-02.4(1), beginning with "Bid prices shall reflect," and <br /> I substitute the following: <br /> Bid prices shall include everything necessary for the completion of the Work <br /> including, but not limited to, providing the materials, equipment, tools, plant and <br /> I other facilities, and the management, superintendence, labor, and all necessary <br /> testing services. <br /> Revise the first sentence in the last paragraph to read as follows: <br /> I Any prospective Bidder desiring an explanation or interpretation of the Bid <br /> Documents, shall request the explanation or interpretation in writing by close of <br /> business three business days preceding the bid opening to allow a written reply to <br /> reach all prospective Bidders before the submission of their Bids. <br /> ISupplement 1-02.4(1) by adding the following: <br /> Bidder acknowledges that he/she has not relied on representation or warranty of <br /> I the City not expressly included in the Contract Documents. <br /> The information provided by the City is not intended to be a substitute for, or a <br /> supplement to. the independent verification by the Bidder to the extent such <br /> independent investigation of the Drawings and Specifications or Site conditions is <br /> I deemed necessary or desirable by the Bidder. Bidder acknowledges that they have <br /> not relied upon City or Engineer furnished information regarding site conditions in <br /> preparing and submitting a Bid. <br /> ISupplement 1-02.4(1) by adding the following: <br /> The City has included a partially filled in Washington State Department of Ecology <br /> (Ecology) Transfer of Coverage (Ecology form ECY 020-87a) for the Construction <br /> I Stormwater General Permit (CSWGP) as part of the Bid Documents. As a condition <br /> of Section 1-03.3, Execution of Contract, the Contractor is required to complete <br /> sections I, Ill, and VIII of the Transfer of Coverage and return the form to the <br /> I Contracting Agency. <br /> The City is responsible for compliance with the CSWGP until the 10 end of day that the <br /> contract is executed. Beginning on the day after the Contract is executed the Contractor <br /> I shall assume complete legal responsibility for compliance with the CSWGP and full <br /> implementation of all conditions of the CSWGP as they apply to the contract Work. <br /> Further supplement 1-02.4(1) by adding the following: <br /> I <br /> I Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 201E <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> IWO No. UP3398 SP-63 <br />