Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> at the discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> I responsive Bidder. <br /> 1-03.1(1) Identical Bid Totals <br /> (January 4, 2016 APWA GSP) <br /> I Revise to read as follows: <br /> After opening Bids, if two or more lowest responsive Bid totals are exactly equal, <br /> then the tie-breaker will be the Bidder with an equal lowest bid, which proposed to <br /> I use the highest percentage of recycled materials in the Project, per the form <br /> submitted with the Bid Proposal, If those percentages are also exactly equal, then <br /> the tie-breaker will be determined by drawing as follows: Two or more slips of paper <br /> I will be marked as follows: one marked "Winner" and the other(s) marked <br /> "unsuccessful." The slips will be folded to make the marking unseen. The slips will <br /> be placed inside a box. One authorized representative of each Bidder shall draw a <br /> slip from the box. Bidders shall draw in alphabetic order by the name of the firm as <br /> I registered with the Washington State Department of Licensing. The slips shall be <br /> unfolded and the firm with the slip marked "Winner" will be determined to be the <br /> successful Bidder and eligible for Award of the Contract. Only those Bidders who <br /> I submitted a Bid total that is exactly equal to the lowest responsive Bid, and with a <br /> proposed recycled materials percentage that is exactly equal to the highest <br /> proposed recycled materials amount, are eligible to draw. <br /> I Supplement 1-03.1 by adding the following: <br /> 1-03.1(2) Preference for Resident Contractors <br /> (******) <br /> I In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an office <br /> located in Washington, then a comparable percentage disadvantage will be applied to <br /> I the Bid of that nonresident contractor. <br /> 1-03.2 Award of Contract <br /> Revise 1-03.2 to read as follows: <br /> I Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. if the lowest responsible <br /> I Bidder and the City cannot agree on an extension by the 45-day deadline, the City <br /> reserves the right to award the Contract to the next lowest responsible Bidder or reject <br /> all Bids. <br /> I The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute the <br /> Contract set forth in the Contract Documents. <br /> 1 1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> I Successful Bidder has 14 calendar days after receiving the Notice of Award to submit <br /> the following documents to the City: <br /> Two executed copies of the Contract. <br /> I Two original payment bonds and two original performance bonds submitted on forms <br /> contained in Contract Documents. <br /> I Cleveland Avenue Division 1 -GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> IWO No. UP3398 SP-69 <br />