My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> inefficiencies and impacts, related to, arising out of, or resulting from, any Work <br /> described in the Change Order. <br /> The Contractor shall obtain written consent of the Surety or Sureties if the City's <br /> Representative requests such consent. <br /> 1-04.4(4) Value Engineering and Cost Sharing <br /> (******) <br /> The Contractor may submit proposals for changing the Plans, Specifications, or other <br /> requirements of the Contract Documents and the City, in its sole discretion, may accept <br /> or reject such proposals. If accepted by the City and if the proposal decreases the direct, <br /> actual costs of constructing the Work, the Contract Sum shall be reduced by fifty percent <br /> (50%) of the direct, actual construction cost saved. Because the City has the sole <br /> discretion whether to consider, accept or reject the Contractor's proposal and the <br /> Contractor has no right to require the City to consider or accept such proposals, the <br /> City's decision is not reviewable by any court. This subsection applies only to change <br /> proposals initiated solely by the Contractor, or its Subcontractors and suppliers, and <br /> does not apply to change proposals requested or initiated by the City or the City's <br /> Representative. The City is not obligated or required to consider any Contractor initiated <br /> change proposals and may, in its sole discretion, refuse to do so. Under no <br /> circumstances shall the Contractor be entitled to additional compensation arising out of, <br /> or related to, the City's refusal to consider or approve a Contractor initiated change <br /> proposal. The Contractor shall do none of the following without the express written <br /> agreement of the City: fail to perform any Work: commence Work on proposed change; <br /> reduce its resources assigned to performance of the Work in order to prepare a change <br /> proposal or in anticipation of approval of a change proposal; adjust or change the project <br /> schedule or take action or fail to take action that would affect the Completion Date of the <br /> Work; take action or fail to take action arising out of the Contractor's change proposal <br /> that would result in the Contractor seeking an adjustment upward of the Contract Sum. <br /> 1-04.5 Procedure and Protest by the Contractor <br /> Delete 1-04.5 and substitute the following: <br /> 1-04.5 Notice by Contractor <br /> (******) <br /> 1-04.5(1) When Notice Must Be Given <br /> Whenever: <br /> 1. The Contractor disagrees with any requirement, direction, interpretation or <br /> determination by the City or City's Representative: <br /> 2. The Contractor knows. or should with the reasonable exercise of ordinary <br /> care know, of a differing site condition as provided in 1-04.7 DIFFERING <br /> SITE CONDITIONS (CHANGED CONDITIONS); <br /> 3. The Contractor knows, or should with the reasonable exercise of ordinary <br /> care know, of a Delay or an event that may cause a Delay; <br /> 4. The Contractor believes, or with the reasonable exercise of ordinary care <br /> should believe, it is entitled to an adjustment of Contract Sum or Time, even if <br /> the total or exact amount or impact cannot yet be determined: <br /> 5. The Contractor believes it is required or directed to perform work that is <br /> outside the scope of the Contract Documents; or <br /> 6. An event occurs, or fails to occur, that the Contractor believes, or should <br /> reasonably foresee, may result in a Contract Claim; or <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-74 I <br />