My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7. The actual quantities of Unit Price Work vary sufficiently from the original <br /> I estimate that Contractor may be entitled to an equitable adjustment of <br /> Contract Sum as provided in 1-04.6 VARIATION IN INCREASED OR <br /> DECREASED QUANTIES; <br /> I The Contractor shall immediately give Notice to the City or City's Representative as <br /> provided in this section and elsewhere in the Contract Documents and Specifications. <br /> Timely and adequate Notice is a condition precedent to a Contract Claim. <br /> I Requests for extensions of Contract Time shall be made and evaluated in accordance <br /> with 1-08.3 PROGRESS SCHEDULE and 1-08.8 EXTENSIONS OF TIME. <br /> Irrespective of any request for additional compensation or Contract Time or a Contract <br /> I Claim that Work is extra and not part of the original scope of Work, the Contractor shall <br /> proceed expeditiously and promptly with the Work as the City orders. <br /> If the Contractor fails to follow the procedures of this Contract, including failing to give <br /> I Notice, the Contractor completely waives any Contract Claims. In its sole discretion, the <br /> City may waive strict compliance with procedures, but any such waiver of one or more <br /> items or elements does not waive the necessity for Contractor's strict compliance with <br /> any other item or element, nor shall such waiver be admissible in any legal proceeding <br /> I for any reason. <br /> 1-04.5(2) Form of Notice <br /> The Notice shall be in writing and include the following minimum information: <br /> I1. A complete and accurate description of the event(s) giving rise to the Notice, <br /> including dates, times, and locations; <br /> 2. A preliminary list of persons involved in such event; <br /> I3. A statement whether the Contractor believes the event may result in a <br /> Contract Claim for additional Contract Time or adjustment of the Contract <br /> 11 Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as <br /> provided in this section. <br /> I 1-04.5(3) Supplemental information <br /> Contractor shall supplement the written Notice as soon as possible with a written <br /> statement providing the following: <br /> 111 1. The date of the event, incident, direction, instruction, interpretation or <br /> determination; <br /> 2. The nature and circumstances giving rise to the Notice: <br /> I 3. The contract provisions relating to the event, incident, direction, instruction, <br /> interpretation or determination; <br /> 4. The estimated dollar cost, if any, of the Extra Work, Delay, change or <br /> I disruption and detailing how the dollar amount estimate was determined; and <br /> 5. An analysis of the progress schedule showing the impact to the schedule <br /> resulting from the change or disruption, if the Contractor is asserting a <br /> I schedule change or disruption; <br /> Throughout any work related to a Notice. the Contractor shall keep complete and <br /> accurate records of costs, expenses, and time incurred for which Contractor will or may <br /> I seek an adjustment. Contractor waives and is estopped from seeking an adjustment of <br /> Contract Sum or Contract Time where Contractor fails to keep and maintain cost, <br /> timekeeping, and scheduling records segregated and contemporaneously allocated to <br /> I Cleveland Avenue Division 1 -GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> IWO No. UP3398 SP-75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.