Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> or pay for Work performed by the Contractor that may be affected by materials, <br /> Equipment, or methods of work not submitted in a timely manner so that final review can <br /> be accomplished before the affected Work is complete. The City shall not be responsible <br /> for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part <br /> by Contractor's failure to submit required information in sufficient time for review, <br /> comment. and correction. Contractor's failure to submit required information in sufficient <br /> time for review, comment and correction shall be deemed a waiver of any and all <br /> Contract Claims for adjustment of Contract Sum or Contract Time arising out of, or <br /> ' related to, such a Submittal. Contractor acknowledges and agrees that it may not rely <br /> upon receiving the City's response to a Submittal in less than 14 calendar days, unless <br /> the City explicitly changes this section by a signed Change Order. <br /> 1-05.3(2) Requests for Information <br /> (******) <br /> Requests for information or clarification from the Contractor to the City shall be treated <br /> as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes <br /> Delete all of 1-05.4 and substitute the following: <br /> The Contractor shall be responsible for setting and maintaining all alignment stakes, <br /> slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br /> paving, channelization, illumination, signing, bridges, and retaining walls, if such <br /> construction is included in this Project. Except for the survey control data to be furnished <br /> by the City, calculations, surveying, and measuring required for setting and maintaining <br /> the necessary lines and grades shall be the Contractor's responsibility. The Contractor <br /> shall provide the City with copies of such calculations and staking data when requested <br /> by the Engineer. Copies of the City provided survey control data are available for the <br /> Bidder's inspection at the office of the Project Engineer. <br /> 1 Any staking requirements for the Project that do not fit field conditions will be reviewed <br /> and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br /> information will be provided to the Contractor for use in completing the Work. <br /> Stakes, marks, and other reference points, including existing monumentation, set by the <br /> City shall be carefully preserved by the Contractor. The Contractor will be charged for <br /> the costs of replacing stakes, markers and monumentation that were not to be disturbed <br /> but were destroyed or damaged by the Contractor's operations. This charge will be <br /> deducted from monies due or to become due to the Contractor. <br /> To facilitate the establishment of these lines and elevations, the City will provide the <br /> Contractor with the following survey control: <br /> ROADWAY, SURFACING AND PAVING <br /> Establish elevation bench marks and center or base line alignment control <br /> points for the mainline, one time only. Provide right of way stakes where <br /> applicable. <br /> Provide rights-of-way, easements or right-of-entry. <br /> Provide the Contractor with technical advice if requested. <br /> Computed grades where needed. <br /> Provide horizontal and vertical curve data. <br /> One copy of transit notes showing reference to horizontal and vertical control <br /> points. <br /> OTHER STRUCTURES <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -81 <br />