My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 6-01 General Requirements <br /> 6-01.9 Working Drawings <br /> 6-02 Concrete Structures <br /> 6-02.3(13) Expansion Joints-Shop Drawings <br /> 6-02.3(16) Plans for Falsework and Forms-Shop Drawings j <br /> 6-02.3(26)A Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS. SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-02 Culverts <br /> 7-02.2 Materials-Catalog Cuts or Standard Plans <br /> 7-04 Storm Sewers <br /> 7-04.2 Materials-Catalog Cuts or Standard Plans <br /> 7-05 Manholes, Inlets, Catch Basins, and Drywells <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 7-09 Water Mains <br /> 7-09.2 Materials-Catalog Cuts or Standard Plans I <br /> 7-12 Valves For Water Mains <br /> 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 7-14 Hydrants <br /> 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 7-15 Service Connections <br /> 7-15.2 Materials-Catalog Cuts or Standard Plans <br /> 7-17 Sanitary Sewers <br /> 7-17.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 8-12 Chain Link Fence and Wire Fence <br /> 8-12.2 Materials-Catalog Cuts or Standard Plans I <br /> 8-13 Monument Cases <br /> 8-13.2 Materials-Standard Plans <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the 111 <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by the <br /> Specifications, related Work performed prior to completion of the Engineer's review of <br /> the pertinent submission will be the sole expense and responsibility of the Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The City's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The City will not be obligated to accept <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018111 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.