Laserfiche WebLink
January 7, 2019 <br /> HWA Project No. 98165 <br /> o The well annulus will be backfilled with hydrated bentonite above the sand <br /> filter pack <br /> • Wells will be fitted with locking, upright, steel standpipe completions. We <br /> understand the City will provide and install protective bollards. <br /> • HWA will provide a geologist or geotechnical engineer to observe the well <br /> installation, log soils, document ground water occurrence, and prepare well <br /> drilling logs. HWA will also monitor well development. Wells will be developed <br /> by the well driller by surging and pumping for 20-30 minutes per well. <br /> • Drill cuttings will be stockpiled on site or broadcast at Client's direction. <br /> • HWA will provide boring logs for all wells, but no other reporting will be <br /> provided. <br /> COST ESTIMATE <br /> Based on the above information, we propose to provide these services on a time and <br /> materials basis for an estimated fee not to exceed$12,620. Details of our estimate may <br /> be found on the attached spreadsheet. The budget presented in this proposal reflects an <br /> estimate based on our current understanding of the project requirements for a scope of <br /> work developed from information provided. HWA reserves the right to transfer hours <br /> and budget dollars between tasks to satisfy project requirements. Our budget also reflects <br /> estimated direct costs to the project for drilling, equipment rental, etc. HWA may also <br /> transfer funds allocated for direct costs to professional/technical hours or vice versa,to <br /> satisfy project requirements. <br /> O•O <br /> We appreciate the opportunity to provide services on this project. If you have any <br /> questions or need additional information,please do not hesitate to contact us. <br /> Sincerely, <br /> HWA GEOSCIENCES INC. <br /> at''' <br /> Arnie Suga4 , HG <br /> Principal H • .geologist <br /> 98165 Reservoir piezos 1 7 19.doc 2 HWA GEOSCIENCES INC. <br />