My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/02/27 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/02/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 9:30:03 AM
Creation date
2/28/2019 9:29:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED <br /> ADDENDUM NO.19 TO IRE <br /> 1991 BOEIM EVERETT MITIGATION <br /> DECISLION DOCUMENT <br /> SEPA#17-009. <br /> November 17,2017 <br /> APPLICANT: The Boeing Company <br /> Attn:Pete McOuire <br /> P.O.Box 3707 <br /> MS:OH-13 <br /> Seattle,WA 98124-2207 <br /> PROJECT LOCATION: 3003 W Cashio R . <br /> Everett,WA 98204 • <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Teresa Weldon Phone: (425)257-8731 <br /> DESCRIPTION OP THE PROPOSED ACTION: <br /> The proposed action is an amendment tO the Decision Document to eliminate the cap of 21,000 <br /> on-aite parking stalls and the cap of 35,000 employees at the Everett Boeing main site in <br /> exchange for the implementation of a direct vehicle traffic counting system called the"Direct <br /> Count Program".The City of Everett and Boeing will jointly participate in this program to <br /> provide direct counting of vehicle traffic at all entrances to E-verett Boeing's Main Site and <br /> , - <br /> The data generated will be compared with baseline data from the 1991 Master Plan FIS to <br /> evaluate actual trip generation.To date,Boeing has paid for 12,315 PM Holz Peak Trips.For <br /> each new PM Peak Hour Dip above the approved baseline traffic Volume.Boeing hall pay a <br /> • traffic mitigation fee calculated in accordance with the traffic mitigation ordinance in effect for • <br /> the Boeing Everett site at the time of c,alcilation.Upoii payment of this to mitigation fee,a <br /> new baseline traffic volume shall be set equal to the sum of the old baseline traffic volume and <br /> the newly mitigation.PM Peak Hour Trips.By implementation of thin program,the future <br /> observed annual traffic counts will be the determining factor in whether traffic raitigation fees <br /> shall be due. <br /> As an example,for PM Peak Hour Trips above 12,315,Boeing would pay$1,006 per new PM <br /> Peak Trip per the SW Everett Subarea Plan,or pay the current traffic mitigation fee(currently <br /> $2,400 per new PM Peak Trip or as adjusted per inflation)ifthe SW Everett Subarea Plan has <br /> been retired or revised.. <br /> _ . <br /> • <br /> E92930 Wetmore Aveime,Suite 8-A,Everef$,WA 98201-4044 S'(42 )257-8731,Fax(425)25'7-8742 <br /> 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.