My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD 2020-01-21
>
Address Records
>
SEAWAY BLVD
>
3301
>
3301 SEAWAY BLVD 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 10:38:59 AM
Creation date
3/7/2019 9:49:11 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49. An approved automatic suppression system shall be provided as required by City Ordinance No. <br /> 3021-07,Chapter 16.76,of the Everett Municipal Code. The system must include a mechanical <br /> water gong bell. Plans for any such system shall be submitted to the Engineering&Public Services . <br /> Department for examination and approval. Such plans shall include plans for the underground mains <br /> that will supply the sprinkler system. <br /> The type of sprinkler to be installed will be determined by the Building Official. It may be an NFPA 13, <br /> NFPA 13R, or NFPA 13D system depending upon several factors. Sprinkler installation shall not <br /> begin without an approved and stamped set of plans from the Engineering&Public Services <br /> Department. The Fire Department will also review the plans and shall field inspect the installation <br /> based only on approved plans that must be on site. Changes to plans must be approved by both the <br /> Engineering&Public Services and Fire Departments. <br /> Aboveground sprinkler piping shall be hydrostatically tested as established in NFPA Standard 13. <br /> Underground piping shall be hydrostatically tested and flushed as established in NFPA Standard 24 <br /> for private fire mains. (Below-ground piping must be installed by Washington State Patrol Licensed <br /> Underground Sprinkler line certified"U"installers. For further information,contact the State Fire <br /> Marshal's Office at(360)596-3900 or contact the Everett Fire Department at(425)257-8124.) All <br /> such tests shall be witnessed by a Fire Department inspector. Call(425)257-8124 or(425)257-8120 <br /> to make an appointment for inspection. <br /> Contractors'materials and test certificates shall be submitted to the Everett Fire Department prior to <br /> issuance of any Certificates of Occupancy. Call(425)257-8124 for more information. <br /> 50. The Snohomish County Emergency Radio System is employed by the City of Everett Fire Department <br /> emergency crews and operates at 800 MHz. Large metal-framed or metal and concrete buildings can <br /> weaken the signal so that communication and,therefore,firefighter safety is compromised. This <br /> structure must meet the requirements of EMC 16.03, Section 510,which specifically addresses <br /> required radio system performance standards in this structure. Your attention to this feature early in <br /> the planning stages will help avoid a costly, last-minute retroactive installation of radio signal <br /> amplification antennae and other equipment. For details,call the Everett Fire Department Plan <br /> Reviewer at(425)257-8124. <br /> 51. Floors and sub-floors at or above grade in buildings(other than parking garages)shall be marked <br /> with numbers, in ascending order,beginning with the number"1"(for the ground floor or first floor), <br /> then"2","3", etc. Letters shall be used only to designate specific areas as detailed below. <br /> Floors below grade in buildings(other than parking garages)shall be marked with the letter"B"(when <br /> there is only one floor below grade). When there is more than one floor below grade, they shall be <br /> marked with the letter"B"followed by n4imbers,in descending order, beginning with the number"1" <br /> (for the floor immediately below the ground floor or first flGor),then"2","3",etc. Example—"B1","B2", <br /> "B3", in descending order. <br /> Mezzanines shall be marked with the letter"M". When there is more than one mezzanine, they shall <br /> be marked with the letter"M"followed by numbers,in ascending order. Example—"Ml","M2",etc. <br /> Parking garages shall use the letter"P"to designate floors. <br /> When there is only one parking level at or above grade, it shall be marked with the letter"P". When <br /> there is more than one parking level at or above grade, they shall be marked with the letter"P" <br /> followed by numbers, in ascending order. Example—"P1""P2", etc. <br /> When there is only one parking level below grade, it shall be marked"P01". When there is more than <br /> one parking level below grade,they shall be marked with the letter"P"followed by numbers, in <br /> descending order. Example—"P01","P02", etc. r <br />
The URL can be used to link to this page
Your browser does not support the video tag.