CENTRAL UTILITY PLANT PARKING LOT Everett,Washington <br /> Based on our evaluation of agency design guidance, it is our opinion that the on-site soils- are <br /> generally suitable for a design infiltration rate of up to 0.2 inches per hour. The underlying glacially <br /> consolidated soil is generally considered to be not suitable for infiltration, with infiltration rates <br /> typically less than 0.25 inches per hour. <br /> Recommended Additional Geotechnical Services <br /> Throughout this report, recommendations are provided where we consider additional geotechnical <br /> services to be appropriate. These additional services are summarized below: <br /> • GeoEngineers should be retained to review the project plans and specifications when complete <br /> to confirm that our design recommendations have been implemented as intended. <br /> • During construction, GeoEngineers should observe temporary cut slopes, observe removal of <br /> unsuitable soils, pavement subgrades, observe installation of subsurface drainage measures, <br /> observe and test structural backfill, and provide a summary letter of our construction <br /> observation services. The purposes of GeoEngineers' construction phase services are to <br /> confirm that the subsurface conditions are consistent with those observed in the explorations <br /> and other reasons described in Appendix D, "Report Limitations and Guidelines for Use." <br /> LIMITATIONS <br /> We have prepared this report for the exclusive use of Providence Regional Medical Center Everett <br /> and their design team for the proposed CUP parking lot in Everett,Washington. The data should be <br /> provided to prospective contractors for their bidding or estimating purposes, but our report and <br /> interpretations should not be construed as a warranty of the subsurface conditions. <br /> Within the limitations of scope, schedule and budget, our services have been executed in <br /> accordance with generally accepted practices in the field of geotechnical engineering in this area <br /> at the time this report was prepared. No warranty or other conditions, express or implied, should <br /> be understood. <br /> Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or <br /> figure), if provided, and any attachments are only a copy of the original document. The original <br /> document is stored by GeoEngineers, Inc.and will serve as the official document of record. <br /> Please refer to Appendix D titled "Report Limitations and Guidelines for Use" for additional <br /> information pertaining to use of this report. <br /> REFERENCES <br /> Washington State Department of Ecology,2005, "Stormwater Management Manual for Western <br /> Washington." <br /> Washington State Department of Transportation, 2012, "Standard Specifications for Road, Bridge <br /> and Municipal Construction." <br /> Page 10 October 17,2012 GeoEngineers,Inc. <br /> File No.10738-010-00 <br /> R <br /> • <br />