My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:01:43 AM
Creation date
3/7/2019 1:09:49 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
664
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAGNUS SON <br /> KLEMENCIC <br /> ASSOCIATES ■ <br /> SOIL <br /> A geotechnical report, compiled by Geoengineers, has been provided for the project. This report <br /> describes the existing soils as glacially consolidated soils below fill and organic soils. Glacially <br /> consolidated soils consist of medium dense to very dense silty sand with variable gravel content and <br /> hard silt and clay. The glacially consolidated soils were encountered in the borings at depths ranging <br /> from near the ground surface to 5 feet below site grades. The glacially consolidated soils extended to <br /> the depths explored. Occasional cobbles and boulders are typical of glacially consolidated soils and <br /> may be present at the site and have been encountered in nearby construction projects. <br /> POTENTIAL EROSION PROBLEMS <br /> There are no known areas of the site that have potential erosion problems. <br /> CONSTRUCTION PHASING <br /> Sequencing and timing of construction activities will be provided when the contractor has been selected. <br /> CONSTRUCTION SCHEDULE <br /> Construction is scheduled to begin in fall of 2016. The completion date is unknown at this time. <br /> FINANCIAL/OWNERSHIP RESPONSIBILITIES <br /> Bond forms and other evidence of financial responsibility for environmental liabilities associated with <br /> construction will be provided when a contractor has been selected. <br /> ENGINEERING CALCULATIONS <br /> Calculations for the proposed stormwater conveyance and flow control facilities are provided in the <br /> project Storm Drainage Report. <br /> CERTIFIED EROSION CONTROL SPECIALIST <br /> A certified erosion control specialist will be identified by the contractor when selected. <br /> DRAWINGS <br /> VICINITY MAP <br /> See Figure 1 for the location of the project. <br /> Construction Stormwater Pollution Prevention Plan <br /> Providence Regional Medical Center Everett, North Site, Everett, Washington <br />
The URL can be used to link to this page
Your browser does not support the video tag.