MAGNUSSON ?` <br /> KLEMENCIC <br /> ASSOCIATES ■ <br /> SITE MAP <br /> The following drawings, included as Figure 3, show the existing topography and site features, property <br /> boundaries,work extents and areas of earth disturbance (site demolition and grading). Any drawings <br /> showing sequencing of the work or interim conditions will be developed by the contractor once selected. <br /> • Topographic and Boundary Survey, Providence Regional Medical Center, Colby Campus CUP Site, <br /> by Bush, Roed and Hitchings, dated 5/3/16 <br /> • Sheets C2.01 and C2.02, Site Demolition Plan <br /> • Sheets C4.01 and C4.02, Grading Plan <br /> Additional information required on the site map, but to be provided by the selected contractor includes <br /> but is not limited to: <br /> • Method of disposal for excess materials— it is expected that all materials not able to be reused on- <br /> site will be disposed of at a permitted disposal facility. Location shall be provided by the contractor <br /> once selected. <br /> • Stockpile, waste storage, and vehicle storage, maintenance, and washdown areas will be provided <br /> by the contractor once selected. <br /> CONVEYANCE SYSTEMS <br /> Temporary conveyance systems required to facilitate sequencing of construction are to be determined by <br /> the selected contractor. Permanent conveyance systems are documented on sheets C5.01 and C5.02 <br /> Storm Drainage Plan included as Figure 4 and sheet C6.01, Utility Plan, included as Figure 5. <br /> TREATMENT AND DETENTION BEST MANAGEMENT PRACTICES <br /> There are no treatment BMPs being implemented for this project. The detention BMP will consist of a <br /> below grade precast concrete vault structure and associated flow restrictor to satisfy the flow control <br /> requirement of the SWMM. The detention BMP location is shown on Figure 4. <br /> There are currently no planned temporary detention BMPs; however,the detention BMP must be <br /> installed and functioning prior to the construction of any new impervious surfaces. This suggests a <br /> construction sequence that must be addressed by the selected contractor. The selected contractor may <br /> employ an alternate sequence or means and methods of construction that must be incorporated into this <br /> document. <br /> EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES <br /> Erosion and sediment control BMPs are documented on sheets C1.01 and C1.02, Temporary Erosion <br /> and Sedimentation Control Plan, included as Figure 6. <br /> DETAILED DRAWINGS <br /> At this time there are no structural practices proposed that are not referenced in the SWMM. <br /> Construction Stormwater Pollution Prevention Plan <br /> 4 <br /> Providence Regional Medical Center Everett, North Site, Everett, Washington <br />