My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:01:43 AM
Creation date
3/7/2019 1:09:49 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
664
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAGNUSSON <br /> KLEMENCIC <br /> ASSOCIATES ■ <br /> OTHER POLLUTANT BEST MANAGEMENT PRACTICES <br /> At this time it is unknown what, if any, pollutants other than sediments may occur during construction. <br /> The selected contractor shall address this item when updating this document. <br /> MONITORING LOCATIONS <br /> The project site stormwater flows discharge to the City of Everett combined sewer system. The selected <br /> contractor shall coordinate requirements for monitoring, sampling and testing with the City of Everett. <br /> CONSTRUCTION SCHEDULE AND PHASING <br /> At this time the construction phasing is unknown. The selected contractor shall address this item when <br /> updating this document. <br /> TWELVE REQUIRED ELEMENTS <br /> There are twelve elements that must be addressed in this CSWPPP. These twelve elements, documented <br /> below, also identify BMPs that are applicable to the project. Elements that do not apply to this project <br /> have been noted and in some cases information will not be available until such time that a contractor is <br /> selected. <br /> The selected contractor shall update this section of the CSWPPP as required based on the planned <br /> construction schedule and sequencing. Modification may require addressing required elements that are <br /> not addressed here and incorporation of additional BMPs. <br /> BMPs referenced in this section are available in Volume II, Chapter 3 of the SWMM. Any additional <br /> BMPs selected by the contractor for implementation shall be selected from those available in the <br /> SWMM. <br /> ELEMENT#1: MARK CLEARING LIMITS <br /> The selected contractor shall update this section as required. <br /> ■ Prior to beginning land disturbing activities, including clearing and grading, clearly mark all clearing <br /> and grading limits, and trees that are to be preserved within the construction area. These shall be <br /> clearly marked, both in the field and on the plans, to prevent damage and offsite impacts. <br /> ■ Plastic, metal, or stake wire fence may be used to mark the clearing limits. <br /> ■ The duff layer, native top soil, and natural vegetation shall be retained in an undisturbed state to the <br /> maximum extent practicable. If it is not practicable to retain the duff layer in place, it shall be <br /> stockpiled on site, covered to prevent erosion, and replaced immediately upon completion of the <br /> ground disturbing activities. <br /> ■ Applicable BMPs: <br /> — BMP C101: Preserving Natural Vegetation <br /> — BMP C103: High Visibility Plastic Fence. <br /> Construction Stormwater Pollution Prevention Plan <br /> 5 <br /> Providence Regional Medical Center Everett, North Site, Everett, Washington <br />
The URL can be used to link to this page
Your browser does not support the video tag.