My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:01:43 AM
Creation date
3/7/2019 1:09:49 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
664
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRMCE Project Title <br /> To: Aldrich+Associates,Inc. Construction Change Directive No.: 004.1 <br /> 810 240th Street SE C C 1)O0 44 I Date• 3/6/17 <br /> Bothell,WA 98021 tri ,°g//j4(—BO/ ‘19/' ZGF Architects LLP <br /> Description of Work: 1815 /3g s-ltc- . 84 <br /> j S23257.02 <br /> PK#10, P1taaE l <br /> 1. Revisions to the civil drawings include the following: <br /> a. Removed Site Demolition Note 15 regarding"The existing water main cannot be taken out of <br /> service until the water main reroute,documented on sheet C601 has been constructed and <br /> accepted by the City of Everett. The Contractor may propose alternate temporary measures to <br /> maintain service that has been coordinated with and approved by the City of Everett."on the <br /> attached revised Sheet.C0.01. <br /> b. Revised as-built water line location as shown on attached revised Sheet C2.01. <br /> c. Revised water line demolition based on as-built water line location as shown on attached revised <br /> Sheet C2.01. Removed references to"See site demolition note 15"associated with revised <br /> sequencing as discussed in conference call on 3/3/17 as shown on attached revised Sheet C2.01. <br /> d. Added note 9"Remove Existing valve and tee. See sheet C6.01 for replaces valves and tee. <br /> Install cap and horizontal thrust block at tee,when water line is removed to the north"As shown <br /> on attached revised Sheet C2.01. <br /> e. Moved CB C-1 based on as-built water line location as shown on attached revised Sheet C5.01. <br /> f Revised thrust block type,size andlocation and fitting revised as shown on attached revised <br /> Sheet C6.01. <br /> g, Revised point of connection to existing water line based on as built water line location as shown <br /> on attached revised Sheet 06:01, <br /> h. Added valves to existing water line as shown on attached revised Sheet C6.01. <br /> i. Deleted thrust block details issued as part of CCD 004 as shown on attached revised Sheet <br /> C7.01. <br /> j. Revised profile based on as-built water line location as shown on attached revised Sheet C8.01. <br /> Change Originate By:Owner and City of Everett directed revisions. <br /> Contractor is Directed as Follows: <br /> Proceed immediately on a Time and Materials Basis. Time sheet and invoices to be initialed by Owner. <br /> Proceed immediately and submit lump sum cast proposal as soon as possible. <br /> Proceed immediately with work. Estimated cost of work is <br /> Payment to the Contractor is to be made on actual cost of work. Contractor to notify Owner if and when <br /> actual cost exceeds the estimates listed above. <br /> x Proposal request Contractor to provide C.O.P. Do not proceed until C.O.P. is approved by Owner <br /> Estimated Schedule Impact per Contractor: <br /> No change in contract completion date, <br /> Contract completion date extended/decreased by calendar days <br /> Authorized b /r/ r[,,.�,,,�r•. -2oi7 Confirmed By / <br /> 4'4" er's - - ►dive Date Contractor Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.