Laserfiche WebLink
PRMCE Project Title <br /> To: Aldrich+Associates,Inc. Construction Change Directive No.: 004.1 <br /> 810 240th Street SE C C 1)O0 44 I Date• 3/6/17 <br /> Bothell,WA 98021 tri ,°g//j4(—BO/ ‘19/' ZGF Architects LLP <br /> Description of Work: 1815 /3g s-ltc- . 84 <br /> j S23257.02 <br /> PK#10, P1taaE l <br /> 1. Revisions to the civil drawings include the following: <br /> a. Removed Site Demolition Note 15 regarding"The existing water main cannot be taken out of <br /> service until the water main reroute,documented on sheet C601 has been constructed and <br /> accepted by the City of Everett. The Contractor may propose alternate temporary measures to <br /> maintain service that has been coordinated with and approved by the City of Everett."on the <br /> attached revised Sheet.C0.01. <br /> b. Revised as-built water line location as shown on attached revised Sheet C2.01. <br /> c. Revised water line demolition based on as-built water line location as shown on attached revised <br /> Sheet C2.01. Removed references to"See site demolition note 15"associated with revised <br /> sequencing as discussed in conference call on 3/3/17 as shown on attached revised Sheet C2.01. <br /> d. Added note 9"Remove Existing valve and tee. See sheet C6.01 for replaces valves and tee. <br /> Install cap and horizontal thrust block at tee,when water line is removed to the north"As shown <br /> on attached revised Sheet C2.01. <br /> e. Moved CB C-1 based on as-built water line location as shown on attached revised Sheet C5.01. <br /> f Revised thrust block type,size andlocation and fitting revised as shown on attached revised <br /> Sheet C6.01. <br /> g, Revised point of connection to existing water line based on as built water line location as shown <br /> on attached revised Sheet 06:01, <br /> h. Added valves to existing water line as shown on attached revised Sheet C6.01. <br /> i. Deleted thrust block details issued as part of CCD 004 as shown on attached revised Sheet <br /> C7.01. <br /> j. Revised profile based on as-built water line location as shown on attached revised Sheet C8.01. <br /> Change Originate By:Owner and City of Everett directed revisions. <br /> Contractor is Directed as Follows: <br /> Proceed immediately on a Time and Materials Basis. Time sheet and invoices to be initialed by Owner. <br /> Proceed immediately and submit lump sum cast proposal as soon as possible. <br /> Proceed immediately with work. Estimated cost of work is <br /> Payment to the Contractor is to be made on actual cost of work. Contractor to notify Owner if and when <br /> actual cost exceeds the estimates listed above. <br /> x Proposal request Contractor to provide C.O.P. Do not proceed until C.O.P. is approved by Owner <br /> Estimated Schedule Impact per Contractor: <br /> No change in contract completion date, <br /> Contract completion date extended/decreased by calendar days <br /> Authorized b /r/ r[,,.�,,,�r•. -2oi7 Confirmed By / <br /> 4'4" er's - - ►dive Date Contractor Date <br />