My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
>
Address Records
>
13TH ST
>
1815
>
SEATTLE CHILDRENS NORTH CLINIC
>
1815 13TH ST SEATTLE CHILDRENS NORTH CLINIC 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:01:43 AM
Creation date
3/7/2019 1:09:49 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEATTLE CHILDRENS NORTH CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
664
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRMCE Project Title <br /> To: Aldrich+Associates,Inc. Construction Change Directive No.: 004.2 <br /> 810 240th Street SE Date: 3/17/17 <br /> Bothell,WA 98021 ZGF Architects LLP <br /> S23257.02 <br /> Description of Work: <br /> 1. Revisions to the civil drawings include the following: <br /> a. Added 2 valves at tee on existing 8"water line north of new vault location as shown on the <br /> attached revised Sheet C6.01. <br /> b. Refer to attached email from Jim Spooner(City of Everett),calling out additional fittings to be <br /> provided and installed by the City of Everett; <br /> Attachment:Email from Jim Spooner,dated March 14,2017 <br /> Drawings Sheets C6.01, <br /> aiddE —7(0Iwlio <br /> 18/5 /3 StreAt <br /> 1'm0. Phage <br /> C,CD 00q <br /> Change Originate By:Owner and City of Everett directed revisions. <br /> Contractor is Directed as Follows: <br /> Proceed immediately on a Time and Materials Basis. Time sheet and invoices to be initialed by Owner. <br /> Proceed immediately and submit lump sum cost proposal as soon as possible. <br /> Proceed immediately with work. Estimated cost of work is <br /> Payment to the Contractor is to be made on actual cost of work. Contractor to notify Owner if and when <br /> actual cost exceeds the estimates listed above. <br /> x Proposal request. Contractor to provide C.O.P. Do not proceed until C.O.P.is approved by Owner <br /> Estimated Schedule Impact per Contractor: <br /> No change in contract completion date <br /> Contract completion date extended/decreased by calendar days <br /> Authorized b //3't'i i 1 - Confirmed By / <br /> •wn s epresentative Date Contractor Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.