My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10627 19TH AVE SE COOLEY SMILES DENTISTRY 2019-03-18
>
Address Records
>
19TH AVE SE
>
10627
>
COOLEY SMILES DENTISTRY
>
10627 19TH AVE SE COOLEY SMILES DENTISTRY 2019-03-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 8:51:29 AM
Creation date
3/7/2019 4:55:59 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10627
Tenant Name
COOLEY SMILES DENTISTRY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � <br /> Cooley Smiles Dental Clinic 17318.20 October 18,2017 <br /> Drainage Report Section II,Page 3 <br /> Minimum Requirement#7: Flow Control: Projects must provide flow control to reduce the impacts of <br /> stormwater runoff from hard surfaces and land cover conversions.The following circumstances require <br /> achievement of the standard flow control requirement for western Washington: <br /> i.) Projects in which the total of effective impervious surfaces is 10,000 square feet or more in <br /> a threshold discharge area, or <br /> ii.) Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or <br /> iii.) Projects that through a combination of effective hard surfaces and converted vegetation <br /> areas cause a 0.15 cubic foot per second (cfs) increase or greater in the 100-year flow <br /> frequency from a threshold discharge area as estimated using the Western Washington <br /> Hydrology Model or other approved model and 15-minute time steps.The WWHM report <br /> for this project can be found in Section IV. <br /> The project requires flow control because the total of effective impervious surfaces is 10,000 sf or more <br /> in a threshold discharge area. See Section IV. <br /> Minimum Requirement#8:Wetlands Protection:This project site's stormwater does not discharge into <br /> a wetland and does not require wetland protection. <br /> Minimum Requirement#9: Operation and Maintenance:An operation and maintenance manual that is <br /> consistent with the provisions in Volume V of the SWMMWW is required for proposed Stormwater <br /> Treatment and Flow Control BMPs/facilities.The party (or parties) responsible for maintenance and <br /> operation shall be identified in the operation and maintenance manual. For private facilities approved <br /> by the City of Everett, a copy of the operation and maintenance manual shall be retained on-site or <br /> within reasonable access to the site, and shall be transferred with the property to the new owner. For <br /> public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate <br /> department. A log of maintenance activity that indicates what actions were taken shall be kept and be <br /> available for inspection. See Section VIII. <br /> 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> ENGINEERING ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.