My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10627 19TH AVE SE COOLEY SMILES DENTISTRY 2019-03-18
>
Address Records
>
19TH AVE SE
>
10627
>
COOLEY SMILES DENTISTRY
>
10627 19TH AVE SE COOLEY SMILES DENTISTRY 2019-03-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 8:51:29 AM
Creation date
3/7/2019 4:55:59 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10627
Tenant Name
COOLEY SMILES DENTISTRY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r i <br /> Cooley Smiles Dental Clinic 17318.20 October 18,2017 , <br /> Drainage Report Section IV,Page 2 <br /> Runoff Treatment <br /> The project requires runoff treatment because it adds and replaces more than 5,000 sf of pollution- <br /> generating hard surface (PGHS). <br /> When using an approved continuous runoff model,the water quality facility must be sized for 91%of <br /> the total runoff volume.The project proposes a permeable pavement facility for flow control which will <br /> infiltrate more than 91%of the total runoff volume before overflowing to the public stormwater main. <br /> The native soil may be used for runoff treatment if it meets SSC-6: Soil Physical and Chemical Suitability <br /> for Treatment per Volume III-3.3.7 of the 2014 SWMMWW. If the existing soils do not meet the criteria, <br /> a 6-inch layer of media meeting the criteria, or a sand filter may be used. <br /> Testing will be done to determine if the soil meets the criteria for runoff treatment prior to construction. <br /> Flow Control <br /> The project must meet the Flow Control Duration Standard because it adds and replaces more than <br /> 10,000 sf of impervious surfaces. Developed discharge durations must match pre-developed durations <br /> for the range of pre-developed discharge rates from 50%of the 2-year peak flow up to the full 50-year <br /> peak flow.The pre-developed condition to be matched shall be forested.The permeable pavement <br /> facility described above for the LID Performance Standard will also be used to meet this Flow Control <br /> Duration Standard. <br /> See the WWHM2012 report at the end of this section and civil plans for the sizing and design. <br /> 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> ENGINEERING ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.