Laserfiche WebLink
r , <br /> Cooley Smiles Dental Clinic 17318.20 October 18,2017 <br /> Drainage Report Section III, Page 3 <br /> Task 3—Field inspect the study area <br /> A site visit was done on the morning of September 15, 2017 on a dry and mostly sunny day with no <br /> significant rain the previous days.The site does not appear to take on significant upstream flows. There <br /> is a ditch system on 106th PI SE to the north of the site that conveys runoff to the storm system in 19th <br /> Ave SE to the west.There is a 24" storm main within 19th Ave SE that conveys runoff from the site to <br /> Silver Lake to the south.There did not appear to be any issues with the storm system. <br /> b <br /> ri <br /> courierwest <br /> , your logistics Arartdsr <br /> e. <br /> ,.., ?,, ,,,..., - --...--1.7-7 7444,„., <br /> ..., . . ... , ,„,,`V f t <br /> I, .. <br /> S w4f <br /> L.,.r... - limoiniI4,44i*.t.,,14.,Ly, .:,-z... . . <br /> , <br /> g <br /> zr <br /> r <br /> r v-. %,-, ✓- :•., wry '? °!..ti... <br /> . .. "€'�, SRM .: ..�. .... ..... ..... <br /> Figure III-2. Frontage of site along 19th Ave SE looking north. <br /> 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> ENGINEERING ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />