Laserfiche WebLink
, l � <br /> Constntction <br /> 1. Lateral and gravity structural calculations must be provided before a structural review <br /> will begin. <br /> 2. Energy calculations (envelope, lighting& mech.) should be provided. <br /> 3. Safety glazing should be labeled on the elevation drawings for the windows with the <br /> bottom edge less than 60"above the floor and within 24"either edge of a door(in a <br /> closed position). Section 2406.4 <br /> 4. Fire blocking should be shown within the furred walls at the level of the suspended <br /> ceiling. Section 708.2.1 <br /> 5. Details for the lateral bracing and compression swts for the suspended ceiling should <br /> be provided. UBC Standazd 25-2 <br /> 6. Roof venting should be provided at a minimum ratio of 1:150. Calculations and <br /> details should be provided. Venting at beam line B should be clarified. Section <br /> 1505.3 <br /> 7. The slope of the entry sidewalk should not be greater than 1:20. A curb cut should be <br /> provided from the pazking access aisle to the sidewalk. Sections 1106.43 @_ <br /> 1106.4.7.1 <br /> Please prepare a response letter showing where each item in this coaection letter is <br /> addressed on the plan set. <br /> Upon resubmission of the drawings, your application�vill be given priority and plan <br /> review will recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to <br /> ensure that the proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> � <br /> nv R. Lee <br /> Plans Examiner <br /> �L <br />