Laserfiche WebLink
�/� -� `� T- n' E <br /> � r�"�x. �,�� ) V/ Y; O N Q <br /> �� � � � ���,�� �k�� LEGEND: in rn o 0 <br /> � � SITE BOUNDARY � U � �Q � a, <br /> ` N y <br /> ••� s�� I UTILITIES-AS SPECIFIED '`'' _ �N `� <br /> Ce �••�`SD I - - - - STORMWATER � � � � � <br /> •� I � -- - - POWER � > <br /> %���� �1 - -- - WATER � � N w <br /> / � '�� l�O .,� -- GAS i- <br /> ! I • ,� '� <br /> / � `���� � EXCAVATION AREA 'A' U O <br /> � <br /> �_,�� �� � ���� ��� EXCAVATION AREA'B' U Q a <br /> :_�' � �/ t a`` � � N <br /> �� �� � ���` s►I ./� „ � BUILDING DEMOLITION O i � � � <br /> � � <br /> / �O / ���` <br /> O l/ i —� TEMPORARY FENCE � N o <br /> �+ � O � �``` 0 in3N o <br /> � � � � '�� --- --- ASPHALT CONTAINMENT BERM � � � �� �+ <br /> � � `�� L U E E � a�i <br /> � (� � ���` � STOCKPILE AND STAGING AREA V� � � �' � <br /> / �� � � � N � <br /> � / ��� O TEMPORARY CONSTRUCTION � � � <br /> � ! �� ENTRANCE PER DEPARTMENT OF •— <br /> / ✓� O I d ECOLOGY BMP C105 T <br /> ���I � �� / 1� �i,,� EXISTING STORM WATER <br /> � � � J�� I ♦ � I FLOW DIRECTION �,.� <br /> \ M <br /> I <br /> � � � � / r � rn � <br /> � � � o <br /> ' � ,, ; � �� � �� �' �E I N TA K E � � NOTES: Q 3 � o <br /> � '� � �� � � 1. LOCATION AND DISTANCES SHOWN ARE APPROXIMATE .c �N � <br /> '� c ao � <br /> � � � r 2. BLACK AND WHITE REPRODUCTION OF THIS COLOR T Y N a' <br /> � � ORIGINAL MAY REDUCE ITS EFFECTIVENESS AND LEAD TO o� Y �?' � <br /> � ` � ` � INCORRECT INTERPRETATION <br /> / � <br /> 0 ��v` � . <br /> �' � SPECIFICATIONS. <br /> � � ��� GENERAL � vIADE Lp� <br /> 1` (/�/ 1. THE TESC PLAN CONSISTS OF PLANNING,INSTALLING,MAINTAINING,AND `�� ��1�ti�As'��;. L�-^ <br /> � ��/ r� / ��'�.,� � � ,'�� REMOVING TESC BEST MANAGEMENT PRACTICES(BMPS)AS SHOWN ON THE �� `� '"^�`": %` � <br /> CJ r + / � ��� 6'►� (� � DRAWINGS,REQUIRED BY THE WASHINGTON STATE DEPARTMENT OF ECOLOGY, � ���� r�' 'z <br /> / � ���`sO � � ^ ,�` OR AS ORDERED BY THE ENGINEER TO PREVENT POLLUTION OF AIR AND WATER, <br /> ��.� / �� � V �_ AND CONTROL,RESPOND TO,AND DISPOSE OF ERODED SEDIMENT AND TURBID <br /> s�,�(�'`�,J � '�.�� � __ _ WATER DURING THE LIFE OF THE PROJECT. I 5� ,^'� c� <br /> � �+O I;�' �'�� / ,__ 2. WORK AREA CONTAINED BY A CONTAINMENT BERM WHICH KEYS INTO THE `°� ���'��� ���` ti��' <br /> / �-' � ' ��.. / "� EXISTING BUILDINGS ON SITE. S`S�'�NAL'v�� Y <br /> ��+,� � / 3. PROTECT EXISTING SUBSURFACE FEATURES WITHIN THE WORK AREA,BUT ` 2 <br /> �.� OUTSIDE THE EXCAVATION AREA. C�'Z���T <br /> � <br /> y1� ` �,,s � <br /> O ♦` <br /> ��`O ;' SITE SET UP <br /> ` � 1. INSTALL,MAINTAIN,AND SUBSEQUENTLY REMOVE TEMPORARY FENCING <br /> � ,�. ' � ` ' `���` WHERE NEEDED.CONTRACTOR IS WHOLLY RESPONSIBLE FOR SITE SECURITY. <br /> , " � � \ ��� 2. PROVIDE TEMPORARY SANITARY FACILITIES FOR THE WORKERS AND THE <br /> �;' �� ENGINEER. z <br /> �<. �,,., ♦ Q <br /> �= , > �� 3. INSTALL, MAINTAIN,AND SUBSEQUENTLY REMOVE A 6-INCH HIGH <br /> � ��•_ __ a � ` ��`� STORMWATER CONTAINMENT BERM,WHERE SHOWN,TO PREVENT STORMWATER J <br /> � ` �.,:....,K i �"� � •� '� �,_ FROM LEAVING THE LIMITS OF WORK.THE BERM SHALL BE CONSTRUCTED WITH ^ <br /> � 4 ' ��/ '~ �� � ASPHALT. �.L <br /> '' i� V ` � �\` <br /> OQ� , � - �"" � �♦ C �_, 4. INSTALL ADDITIONAL TEMPORARY EROSION AND SEDIMENT CONTROL(TESC) �'1 <br /> � ' �� � l�I QU � � O _ MEASURES AS NEEDED TO COMPLY WITH THE REQUIREMENTS OF THE CIN OF U <br /> J 0 �.' �. � ��` ���� � EVEREn. ♦^ <br /> '0 �� � �� O 5. CONDUCT PUBLIC AND PRIVATE UTILIN LOCATE TO IDENTIFY ANY v, <br /> � ~�'� � � �'� SUBSURFACE UTILITY LINES w <br /> � �` O � 6. CONSTRUCT AND MAINTAIN STOCKPILE STAGING AREA S .STOCK <br /> ( ) PILE AREAS � <br /> SHALL BE LINED WITH 6 MIL PLASTIC SHEETING AND BERMED AT THE EDGES TO <br /> ��'"� `�' )� Q �� � PREVENT STORMWATER RUNOFF AND RUN-ON. J <br /> f 7. REMOVE ASPHALT OVER THE EXCAVATION AREA AND DISPOSE OF UNDER O <br /> � � ' 0� '� � / � WASTE PROFILE OR BY RECYCLING. <br /> � I ' / 1`,.• � "� y V � � LL <br /> .. , � �, <br /> l,� <br /> `� r. ` I , �* ,r' D O� ;� � WATER MANAGEMENT � <br /> �`\ ` � � .,,/ � � �, ! O 1. THE PROJECT IS DESIGNED TO CONTAIN ALL WATER ON SITE.NO OFFSITE z <br /> Q r � / DISCHARGES ARE ALLOWED. O Z <br /> ` �� I � I ` O � �� Q / 2. THE CONTRACTOR SHALL PROVIDE DEWATERING OF THE EXCAVATION AS 0 O <br /> 2 NECESSARY AND PROVIDE PROPER DISPOSAL FOR PETROLEUM AFFECTED U � � <br /> � � � l � � GROUNDWATER AND SURFACE WATER PRODUCED DURING EXCAVATION <br /> � � � � � 1 ` O ACTIVITIES. � O � <br /> �� ' �;k' .h O � L� 3. A CONTINUOUS PERCHED GROUNDWATER LENS HAS NOT BEEN IDENTIFIED ON Z � Z <br /> / �� / SITE.INTERMITTENT GROUNDWATER WAS IDENTIFIED DURING DRILLING AND <br /> l � ' .� C � / � � ;,,i � � GROUNDWATER IS PRESENT IN THE UPPER SIX FEET OF BACKFILL SAND IN THE � Z = <br /> � �,� <br /> � f �� � FORMER UNDERGROUND STORAGE TANK(UST)AREA. � W '^ <br /> � �� Y� _ _ V� <br /> o /��' � Q � Q <br /> � �� ' �_!r <br /> ♦�` � �, � �l O TESC NOTES(REQUIRED BY CIN OF EVERET� W � � <br /> ��``O ' � O 00 �� v'� 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC)PLAN DOES NOT �/J � " <br /> �` O Q � � /� � CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN(E.G. Q w H <br /> � � �� SIZE AND LOCATION OF ROADS,PIPES, RESTRICTORS,CHANNELS, RETENTION <br /> � FACILITIES,UTILITIES). � � W <br /> ''{/ ^ 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, � � � <br /> `� O� `' � � MAINTENANCE,REPLACEMENT,AND UPGRADING OF THESE ESC FACILITIES IS THE <br /> ` ` �� � \�/ � � COMPLET DILAND APPROVED AND VEGE A ON/LANDSCAPING�IS ESTABLIS EDS Z O W <br /> � ' O � W <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE <br /> � ` ~ ��, � O � A � CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.DURING THE � <br /> W � (,i Q� CONSTRUCTION PERIOD,NO DISTURBANCE BEYOND THE FLAGGED CLEARING � <br /> � ��� ; O� '�� O LIMITS SHALL BE PERMITTED.THE FLAGGING SHALL BE MAINTAINED BY THE O <br /> '� /�, � '' O� - APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br /> � � �� �� � ���_,� v '`� � �`^�� ! �� O� � ;;"�I rj� /� 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN � <br /> � �' � � � •-r CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES,AND IN SUCH A <br /> � � "�` �� � MANNER AS TO INSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT � <br /> � .,, n� ENTER THE DRAINAGE SYSTEM,ROADWAYS,OR VIOLATE APPLICABLE WATER � <br /> � � � `�'�� 5.TTHE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS � <br /> � �`' / FOR ANTICIPATED SITE CONDITIONS.DURING THE CONSTRUCTION PERIOD, <br /> � ```` � � STORM EVENTSIAND SO ENSURE THAT SED ENNA D SED M NTELADEN WATER � <br /> � '. <br /> � �'�..,, DO NOT LEAVE THE SITE. O <br /> � ` ` APPLICANT/CONTIRACTOR AND MAINTAINED AS ECESSARY TO ENSURE THEIR � <br /> CONTINUED FUNCTIONING. � <br /> a 7, THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED 1 � 1 <br /> X <br /> W A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR �iJ <br /> .� STORM EVENT. I--� <br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br /> LL� N ACCUMULATE WITHIN A TRAPPED CATCH BASIN.ALL CATCH BASINS AND <br /> N CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.THE CLEANING <br /> OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM DRAWN BY: <br /> � SYSTEM. E I N <br /> � 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br /> BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE CHECKED BY: TWL <br /> � PROJECT.ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br /> � , <br /> � PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. DATE <br /> p 0 10 20 <br /> � <br /> c <br /> � FEET 11/17 <br /> � PROJECT N0, <br /> � 160594V003 <br /> m <br /> � <br /> � <br /> cc <br /> F I G U R E <br /> � G-3 <br />