Laserfiche WebLink
Z7 (n � N N E <br /> � N � � <br /> U <br /> ^` W W �Q � � <br /> W � <br /> � � N � <br /> MOUND SPOILS TO 6 MIL PLASTIC COVERING OVER SPOIL ,� U � N �� � <br /> NOTES ENSURE POSITIVE PILE,CITY OF TACOMA AND ECOLOGY BMP � � T �, " <br /> RUNOFF C123,PROVIDE 2'MIN OVERLAP IN JOINTS � � 05 w <br /> 1. STABIL2ED CONSTRUCTION ENTRANCE SHALL MEET OF PLASTIC SHEETING � <br /> THE REQUIREMENTS Of WSDOT STANOARD ,� <br /> SPECIFICATI�N SECTION 8-01.3(7). PLACE EXCAVATION ANCHOR EDGES OF PLASTIC •- Q <br /> SPOILS ON 6 MIL SHEETING WITH SANDBAGS U <br /> PLASTIC SHEETING OR TIRES ON ROPES,SPACED (� � Q N <br /> 6'OC MAX � <br /> d N <br /> _ _25�� f -INSTALI DRIVEWAY CULVERT 1'MIN Q L' � � N <br /> - - - IF THERE 15 A ROADSIDE DITCH Typ � � SPECIFICATIONS: � °' °� � � <br /> P R E S E N T ,;f:, .i,`'�;.; � Q c� o <br /> 25���� � `'```°` '':�=�" TESC NOTES(REQUIRED BY CITY OF EVERETT) (� .� � � � ^ � <br /> .: <br /> D / n`� � ^ cn <br /> -� �x15�IKG R�A � � �, PAVEMENT � V E E � � <br /> / � � � -30'MIN TYPICAL 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC)PLAN DOES NOT � � � N <br /> /�� CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN(E.G.SIZE AND � � � � <br /> __ � / //�' LOCATION OF ROADS,PIPES,RESTRICTORS,CHANNELS,RETENTION FACILITIES,UTILITIES). � � � � <br /> _- - - � _ - DETAIL -TYPICAL STOCKPILE PROTECTION 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,MAINTENANCE, <br /> � " � REPLACEMENT,AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br /> - - � / _ " NO SCALE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br /> ' - -" � _--- <br /> � / _ - VEGETATION/LANDSCAPING IS ESTABLISHED. <br /> / � � / � _ _ ___ __ ,-PERMEABLE BAllAST TYP SEE 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY � <br /> / / � � � � STANDARD SPECIFICATION a> a�o <br /> � � � �� FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION,DURING THE CONSTRUCTION PERIOD,NO <br /> � � �� �� SECTiON 9-03.9(2) DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED.THE v � o <br /> � � FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF Q' � r E <br /> 1' MIN � CONSTRUCTION. r r o <br /> DEPTH 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION � � � � <br /> LENGTH AS REQUIRED 100'MIN,EXCEPT TYPICAL WITH ALL CLEARING AND GRADING ACTIVITIES,AND IN SUCH A MANNER AS TO INSURE THAT '- 'i N `� <br /> MAY BE REDUCED TO 50'MIN FOR SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, °' Y � `° <br /> SITES WITH LESS THAN ONE ACRE --' � ROADWAYS,OR VIOLATE APPLICABLE WATER STANDARDS. <br /> OF EXPOSED SOIL OR APPROVED BY INSPECTOR `� 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br /> PLACE CONSTRUCTION GEOTExTIIE FOR SOIL � \ ANTICIPATED SITE CONDITIONS.DURWG THE CONSTRUCTION PERIOD,THESE ESC FACILITIES <br /> STABILIZATION FROM THE EDGE OF THE EXISTING \�'�-----pROVIDE FU��WIDTH OF SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br /> ROADWAY TO THE CONSTRUCTION ENTRANCE, SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. <br /> �R AS DIRECTED BY THE ENGINEER---- -- INGRESS/EGRESS AREA <br /> 15'MIN STRAW WATTLE OR SANDBAGS OR 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY BY THE APPLICANT/CONTRACTOR <br /> COMPOST SOCK EQUIVALENT AS AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. ��;`�-w�� ��R�>� <br /> .:a �1�i.is�j, �. <br /> NEEDED TO SECURE 7. THE ESC FACIUTIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM �-�' Y'�' �' � <br /> AND ENSURE OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. `�` �.� = j;., �p`��' <br /> ISOMETRIC VIEW � GROUND CONTACT `� ,-����' '� <br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE �.�.5� <br /> CONSTRUCTION ENTRANCE WITHIN A TRAPPED CATCH BASIN.ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE � }W , <br /> 4'MIN CLEANED PRIOR TO PAVING.THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN "° '"` <br /> WATER INTO THE DOWNSTREAM SYSTEM. � '�-4 �� �'�� �s�" <br /> �'�, �i�I���'',.�? <br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF `S'SI��r,���;��' <br /> PAVEMENT CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.ADDITIONAL <br /> MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR '�l ILI ,`'� <br /> THE DURATION OF THE PROJECT. <br /> DETAIL -TEMPORARY CONSTRUCTION ENTRANCE DETAIL -STORM WATTLE ON PAVEMENT <br /> NO SCALE NO SCALE BMP INSTALLATION <br /> 1. BMPS SHALL BE INSTALLED IN ACCORDANCE WITH THE TESC PLAN AND DETAILS. <br /> 2. INSTALLATION INSTRUCTIONS AND DETAILS SHALL BE EQUIVALENT TO THE"STORMWATER <br /> MANAGEMENT MANUAL FOR WESTERN WASHINGTON,"FROM THE WASHINGTON STATE <br /> DEPARTMENT OF ECOLOGY;2014(CURRENT VERSION) <br /> BMP MAINTENANCE <br /> 1. BMPS SHALL BE MAINTAINED FOR THE LIFE OF THE PROJECT OR UNTIL ORDERED BY THE <br /> ENGINEER. <br /> 2, BMPS SHALL BE MAINTAINED DURING ALL SUSPENSIONS OF WORK AND ALL NON-WORK <br /> NOTES PERIODS. <br /> 1. CATCH BASIN INSERTS SHAIL BE REMOVED AT THE 3. BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED <br /> S"MAX PERFORMANCE OF THEIR INTENDED FUNCTION AND IN ACCORDANCE WITH THE APPROVED <br /> END OF THE PROJECT. <br /> DRAINAGE GRATE ' TRIM TESC PLAN. <br /> 2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN 4. SEDIMENTS REMOVED DURING BMP MAINTENANCE SHALL BE PLACED AWAY FROM THE <br /> DRAINAGE OEVICES PER THE MANUFACTURES'S EXCAVATION AREAAND DISPOSED OF OFFSITE. <br /> RECOMMENDATIONS.CATCH BASIN INLET INSERTS 10' ♦/'� <br /> GRATE FRAME - -� <br /> -- - OVERFLOW BYPASS SHALL BE INSTALLED IN CURB INLETS. ; <br /> V J <br /> BELOW INLET GRATE BMP INSPECTION J <br /> SEDIMENT 3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO 2.5" 5" 2.5" _ <br /> DEVICE CLEARING AND GRADING ACTIVITY,OR UPON �--�{ - 1. AT A MINIMUM,INSPECT ALL TESC BMPS: / <br /> AND DEBRIS - - - I <br /> PLACEMENT OF A NEW CATCH BASIN. a.WEEKLY AND AFTER ANY MEASURABLE RAIN EVENT(0.5 INCHES OR GREATER) Q z <br /> �' - FILTERED WATER BETWEEN APRIL 1ST AND SEPTEMBER 31ST. � Q O <br /> 5 4. SEDIMENT SHALL BE REMOVED FROM THE UNIT � <br /> WHEN IT BECOMES ONE THIRD FUL�OR IN 1"R TYP 2 PL-- b.DAILY AND AFTER ANY MEASURABLE RAIN EVENT(0.5 INCHES OR GREATER) �y L <br /> �. �� ACCORDANCE WITH THE MANUFACTURES' ASPHALT PAVEMENT � BETWEEN OCTOBER 1STAND MARCH 31ST. Q O '- <br /> INSTRUCTIONS. AS SPECIFIED 2. DEFICIENCIES IDENTIFIED DURING THE INSPECTIONS SHALL BE CORRECTED WITHIN 24 V <br /> HOURS OR AS DIRECTED BY THE ENGINEER. Z <br /> � 5. SEDIMENT REMOVAL SHALL BE ACCOMPUSHED BY � Q � <br /> REMOVING THE INLET INSERTS,EMPTYING,AND 3. NOTE REPAIRS OR IMPROVEMENTS NEEDED,IF ANY,AND NOTIFY CONSTRUCTION AND <br /> t�------ RE-INSTALLING IT INTO THE CATCH BASIN,DO NOT � SEDIMENT CONTROL LEAD(CESCL)OR SITE SUPERINTENDENT TO IMPLEMENT CORRECTIVE � W <br /> WASH SEDIMENT INTO STORM DRAINS WHILE ACTIONS. <br /> CLEANING. ;� 4. OBSERVE SITE DURING STORMS TO ENSURE RUNOFF IS NOT LEAVING THE SITE AND TAKE � N � <br /> 6. SIZE THE BELOW INLET GRATE DEVICE(BIGD}FOR THE CORRECTIVE MEASURES TO PREVENT RUNOFF IF IT IS. L.L � <br /> STORM WATER STRUtTURE IT WILL SERVICE. 5. IMPLEMENT ADDITIONAL BMPS TO ADDRESS SITE SPECIFIC EROSION CONTROL,IF NEEDED. r^ W <br /> V♦ <br /> 6. INSPECT STREET SURROUNDING THE SITE FOR TRACK OUT.IF TRACK OUT IS PRESENT IT �/ <br /> 7. THE BIGD SHALL HAVE A BUILT•IN HIGH-FLOW RELIEF SHALL BE CLEANED UP IMMEDIATELY.SOILS AND DEBRIS SHALL BE REMOVED FROM THE W � <br /> SECTION VI EW SYSTEM(OVERFLOW BYPASS). PAVEMENT BY SWEEPING OR SHOVELING AND TRANSPORTED BACK TO THE EXCAVATION OR � W <br /> STOCKPILE AREA. <br /> 8. THE RETRIEVALSYSTEM MUSTAILOW REMOVALOF EXTRUDED ASPHALT CONCRETE CURB O � W <br /> THE BIGD WITHOUT SPILLING THE COLLECTED 7. INSPECT FOR DUST DURING DRY PERIODS ry N <br /> MATERIAL. L.L L.L <br /> cn 8. ALL REPORTS PRODUCED SUMMARIZING SITE INSPECTIONS SHALL BE RETAINED ON-SITE <br /> FOR THE DURATION OF THE PROJECT AND MADE AVAILABLE FOR REVIEW AT THE REQUEST w <br /> � 9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br /> OF THE ENGINEER. O <br /> � j`,� TYP CALAL SYSTEM StANDARD SPECIFICATION 8-01.3(15). ' ` � W <br /> V � BMP REMOVAL v^ <br /> � DRAINAGE GRATE � � I� C/J <br /> I- `'�' 2"X4" 1. BEFORE PROJECT CLOSEOUT,ALL SEDIMENT FROM THE WORK AREA SHALL BE REMOVED � <br /> 6"MIN TO THE SATISFACTION OF THE ENGINEER.SEDIMENTS REMOVED SHALL BE DISPOSED OF <br /> � OFFSITE. � <br /> � � I ASPHALT PAVEMENT 2. ALL TEMPORARY BMPS SHALL BE REMOVED UPON PERMANENT STABILIZATION OF THE <br /> �; � � <br /> ? `� ;_, � �� AS SPECIFIED SITE. <br /> 3. PERMANENT STABILIZATION SHALL OCCUR UPON COMPLETION OF THE PLACEMENT OF <br /> � � � � HOT MIX ASPHALT. <br /> � BELOW INLET GRATE <br /> DEVICE - � � �-OVERFLOW BYPASS <br /> 3 % <br /> � TYPICAL <br /> 1 <br /> � � <br /> I� 1� -- i I <br /> � J <br /> � <br /> �n - <br /> � <br /> W ISOMETRIC VIEW ASPHALT WEDGE CURB <br /> � <br /> � <br /> � <br /> N <br /> � DETAIL -TYPICAL CATCH BASIN INSERT DETAIL -TYPICAL ASPHALT CURB <br /> � NO SCALE NO SCALE <br /> DRAWN BY: E I N <br /> O <br /> � CHECKED BY: TWL <br /> � <br /> � DATE <br /> ° 11/17 <br /> � <br /> � <br /> � <br /> .� <br /> R JECT N0. <br /> °° 160594V003 <br /> � <br /> � <br /> � <br /> o F I G U R E <br /> cc <br /> � G-4 <br />