Laserfiche WebLink
� "' N E <br /> a hl « � � ;�� �Ta, � °—' N � � <br /> � �� �`A I �''" _' 1}` i � .Y I��. <br /> r�� <br /> � � � <br /> ��, �{ .�� qw j r � �,�h LEGEND: SITE BOUNDARY N � � 3 � N � <br /> ��� � UTILITIES-AS SPECIFIED ,�,,,, U � N �� ro <br /> C� ���� s � (�D - --- STORMWATER � � � �, " <br /> �'V_ � � N � <br /> � <br /> �_ �O <br /> �� �__ EXCAVATION AREA 'A' ._ '' <br /> ` �'�(�,` �✓��� EXCAVATION AREA'B' � U C'° <br /> l �� <br /> I ��� —�- TEMPORARY FENCE V (f� � � <br /> / „'�` a? c� <br /> � ��.`i�` ��� — -- ASPHALT CONTAINMENT BERM O �` `n� � E <br /> / ��►,� �/D —o-- PIPE PILING AS NECESSARY TO '� � Q N <br /> 0 <br /> Q ` U <br /> ♦ / � �` COMPLETE EXCAVATION (n .�+ � � � � �, <br /> � `, ' ``���` �--— PIPE PILING-DETAIL SHOP � V � � N ro <br /> . <br /> I '/� <br /> � ' ``�♦ v, � � UHv <br /> ` N <br /> � `"��` NOTES: � � � <br /> � �� 1. LOCATION AND DISTANCES SHOWN ARE APPROXIMATE '— <br /> (� 2. BLACK AND WHITE REPRODUCTION OF THIS COLOR <br /> / ' <br /> �� J �� � ORIGINAL MAY REDUCE ITS EFFECTIVENESS AND LEAD TO <br /> �♦� � � INCORRECTINTERPRETATION M <br /> / �f� / � a� ao <br /> r ' � � _ � o <br /> � <br /> � ; � ` % � ERVICE INTAK� ;i � � �N o <br /> , � �' T ,—�� N � <br /> , I O� Y � c'�J <br /> � <br /> , <br /> � Vq <br /> . , U� l' <br /> � SPECIFICATION3: <br /> � e EXCAVATION o�`�^'��E Lr�C� <br /> � ��� 1. EXCAVATE SITE SOIL TO THE LIMITS SHOWN USING A TEMPORARY PIPE PILING � ����`�'���b ,t`! <br /> � ti ,-�� �. ; <br /> � � �'��,` : SUPPORT SYSTEM;SEE GEOTECHNICAL REPORT AND STRUCTURAL PLAN � � 1�, � �" <br /> I �, �+�� 1 SHEETS.CONDUCT EXCAVATIONS IN A SAFE MANNER.STOP WORK IF DIRECTED � �-• 9 '2 <br /> �C � � 0 ��.�!V � �� BY THE ENGINEER. �$�.` <br /> A'� �� � � �`•�� ' 2. MAINTAIN STRICT IMPACTED ZONE DELINEATION AND CONTROL.CONTRACTOR °x �� � <br /> r�� sII „�y � `�i�� � IS WHOLLY RESPONSIBLE FOR ANY CLEANUP,ADDITIONAL EXCAVATION,AND � 1Pfi' �t"��O r{,�' <br /> ��O � ��,� � CONFIRMATION SAMPLING,OR OTHER RAMIFICATIONS CAUSED BY SPREADING '{'�S �15�'� Gti� <br /> �� IMPACTED MATERIAL AROUND THE SITE OR OFF SITE.ALL LOADS MUST BE SI�NAL�� <br /> � � � �� � COVERED PRIOR TO LEAVING THE SITE.DO NOT USE THE SAME BUCKET THAT I) <br /> �•.�� WAS USED FOR WASTE EXCAVATION FOR CLEAN BACKFILL UNLESS IT HAS BEEN ������' <br /> �"' %� DECONTAMINATED AND INSPECTED BY THE ENGINEER.KEEP THE STREET CLEAN. <br /> �� � �O ``�` ,,� <br /> O REMOVE ANY SPIILS IMMEDIATELY. <br /> �".� ♦`O 3. EXCAVATED CONTAMINATED SOIL MAY BE DIRECT-LOADED ASSUMING THE <br /> �� MATERIAL PASSES A PAINT FILTER TEST.EXCAVATED WET MATERIAL MAY NEED <br /> ,,,;�` �� TO BE STOCKPILED TO DRAIN TO PASS THE PAINT FILTER TEST PRIOR TO <br /> '" r^� ` ��` SHIPMENT. USE OF A DEWATER ROLL OFF BOX IS AN ACCEPTABLE ALTERNATIVE <br /> +. ` ��`� � FOR HANDLING WET MATERIAL. <br /> ;°' ,:'� �♦ <br /> ♦ <br /> 4. STOCKPILE EXCAVATED MATERIAL WITHIN THE CONTAINMENT BOUNDARIES. <br /> ,� i' `�♦ EXCAVATED SOIL MAY BE STOCKPILED FOR STAGING/REUSE OR DEWATERING <br /> ,� , �, ��� PRIOR TO SHIPMENT.COVER THE STOCKPILES DAILY. <br /> 'r' � <br /> " �'�K , r` �♦ �` 5. CONDUCT EXCAVATION AND LOADING IN A MANNER THAT MINIMIZES DUST <br /> *� ��`�.. x ' ��` GENERATION.APPLY WATER OR OTHER MEANS AS NEEDED FOR DUST CONTROL. <br /> �� ;i \ .' ''.., , �� �O 6. A LICENSED SURVEYOR SHALL ESTABLISH SURVEY MONITORING POINTS ON <br /> �-� � s�I STRUCTURES ADJACENT TO THE EXCAVATION.OBTAIN BASELINE READINGS <br /> 1� � ,� � . ; ��`` S ,� PRIOR TO PILE INSTALLATION AND MONITOR DAILY DURING EXCAVATION <br /> �o, � O ACTIVITIES.SURVEY DATA PROVIDED TO ENGINEER DAILY. <br /> � <br /> � �� �� ��� � 7. EXCAVATION AREA'B'SHALL BE COMPLETED USING A FOUR SIDED RIGID <br /> TRENCH BOX.THE SHORT SIDE OF THE TRENCH BOX SHALL FACE THE BUILDING <br /> '\, FOUNDATION. <br /> "h '�` /r' O� 8. EXCAVATION AREA'B'SHALL NOT REMAIN OPEN TO FULL DEPTH OVERNIGHT. <br /> - THE CONTRACTOR SHALL BACKFILL THE EXCAVATIONS ABOVE THE BUILDING <br /> \`, / FOUNDATIONS PRIOR TO END OF WORK EACH DAY. <br /> `��` 9. TEMPORARY CONTAINMENT WILL BE CONSTRUCTED DURING EXCAVATION OF <br /> � �"� � EXCAVATION AREA'B'TO LIMIT DISTURBANCE TO THE FACILITY. <br /> 10.UPON COMPLETION OF EXCAVATION OF CONTAMINATED SOILS,THE � Z <br /> f� EQUIPMENT SHALL BE DECONTAMINATED TO A DEBRIS CLEAN LEVEL OF <br /> CONTAMINATION.ENGINEER TO INSPECT AFTER COMPLETION. � Q O <br /> '' 11.SOILS EXCAVATED AND DEEMED RE-USABLE SHALL BE STOCKPILED FOR N <br /> LL <br /> � <br /> ,, x`� REUSE AS BACKFILL. J O � <br /> �� ��� � � BACKFILL � � Z <br /> �"� jt � 1. REGENESIS ORS ADVANCED,OR SIMILAR PRODUCT,SHALL BE MIXED INTO � Z = <br /> � '�` C � NATIVE SOILS AT THE BASE OF THE EXCAVATION,PRIOR TO PLACEMENT OF '/� <br /> {� X �� BACKFILL,IN AN EFFORT TO PROVIDE ENHANCED, IN-SITU AEROBIC O W v, <br /> �`�• -` BIOREMEDIATION OF POTENTIAL PETROLEUM HYDROCARBONS REMAINING IN THE � Q <br /> ♦ >:' < <br /> , �Tr '`�. . SOIL. <br /> '` � �� ��� 2. BACKFILL MAY BE PLACED ONCE THE EXCAVATION BASE AND SIDEWALLS HAVE � � � <br /> � �'..� SD BEEN ACCEPTED BY THE ENGINEER.PLACE BACKFILL IN UNIFORM LOOSE LIFTS Q � <br /> ��� NOT EXCEEDING 8 INCHES IN THICKNESS. w � <br /> � � <br /> \ � ,, L ��� 3. PROVIDE SOIL SAMPLES TO THE ENGINEER FOR PROCTOR AND GRADATION � � <br /> r� q ��` TESTING WITHIN 3 WORKING DAYS OF INTENDED USE. Q � LLJ <br /> '!� � ' �'� 4. CHARACTERIZATION TESTING SHALL BE COMPLETED AT A LABORATORY � <br /> ACCEPTED BY THE ENGINEER AND SHALL INCLUDE THE FOLLOWING: U � <br /> � ��' � p w <br /> a.PETROLEUM HYDROCARBONS(NWTPH-HCID) � \ <br /> � b.RCRA 8 METALS(EPA METHOD 200.8/1631 E) w w <br /> � 5. IF SOFT SOILS OR FREE STANDING WATER ARE ENCOUNTERED AT THE BASE <br /> OF THE EXCAVATION AREA,THE BASE OF THE EXCAVATION SHALL BE STABILIZED <br /> w USING QUARRY SPALLS MEETING WSDOT SECTIONS 9-13.1(1)AND 9-13.1(5). <br /> BUCKET COMPACTION OF THE BACKFILL WILL BE ADEQUATE IN THESE AREAS.NO <br /> � COMPACTION TESTING WILL BE PERFORMED ON THE QUARRY SPALL BACKFILL. <br /> � � �` � � �' � �� QUARRY SPALLS SHALL BE PLACED TO 1-FOOT ABOVE GROUND WATER. <br /> 1- � �� 6. COMPACT EACH LIFT OF BACKFILL MATERIAL(STRUCTURAL FILL OR ON-SITE <br /> � CLEAN OVERBURDEN SOILS)TO AT LEAST 90%OF THE ASTM D1557 MAXIMUM DRY <br /> O DENSITY, FROM THE BOTTOM OF THE EXCAVATION TO WITHIN FOUR(4)FEET <br /> BELOW THE PAVEMENT ELEVATION,AND 95%IN THE UPPER FOUR(4)FEET <br /> g BELOW THE PAVEMENT ELEVATION.ALL BACKFILL SHALL BE COMPACTED AT A <br /> MOISTURE CONTENT WITHIN THREE(3)PERCENT OF THE OPTIMUM MOISTURE <br /> � CONTENT.ADDITIONAL CARE SHOULD BE TAKEN TO ENSURE STABILITY ALONG <br /> � EXCAVATION SIDEWALLS. <br /> ti <br /> 7. PLACE AND COMPACT THE PAVEMENT SUBGRADE TO 95%OF THE MAXIMUM <br /> � DRY DENSITY.PAVEMENT SUBGRADE SHALL BE AT LEAST 6 INCHES THICK. <br /> � <br /> � <br /> �- COMPACTION CONTROL TESTING <br /> X 1. LABORATORY AND FIELD TESTS SHALL BE PERFORMED BY THE ENGINEER TO <br /> W <br /> � DETERMINE COMPLIANCE WITH THE PROJECT SPECIFICATIONS. <br /> f!) 2. FIELD TESTS TO DETERMINE IN-PLACE COMPLIANCE WITH REQUIRED <br /> � N DENSITIES AS SPECIFIED,SHALL BE PERFORMED BY THE ENGINEER IN <br /> ACCORDANCE WITH ASTM D 2922, <br /> � a.IN-PLACE DENSITY OF FILUBACKFILL SHALL BE PERFORMED AT A DRAWN BY: E I N <br /> MINIMUM FREQUENCY OF TWO TESTS PER 5000 SQUARE FEET OF <br /> C�D MATERIAL PLACEMENT.AT THE ENGINEER'S OPTION,THE NUMBER OF CHECKED BY: TWL <br /> � TESTS MAY BE REDUCED IF CONSISTENT CONDITIONS AND COMPACTION <br /> p EFFORTS ARE DEMONSTRATED,OR INCREASED IF NECESSARY. DATE <br /> � 0 10 �0 11/17 <br /> � <br /> mFEET PROJECT N0. <br /> � <br /> 160594V003 <br /> � <br /> � F I G U R E <br /> ° G-5 <br />