Laserfiche WebLink
Kirk Brooks <br /> From: Michael Brick <br /> Sent: Friday,April 29, 2016 12:29 PM <br /> To: Kirk Brooks <br /> Subject: Polygon Riverfront (Eclipse and Simpson Sites)Traffic Mitigation Fees <br /> Kirk, <br /> I located the Traffic Impact Analysis by Transportation Engineering NorthWest for this project dated 6/16/2014. Based <br /> on their study I have figured out the per-unit and proportionate share fees for these projects. Here is a breakdown to <br /> the traffic mitigation fees due for the Polygon Riverfront projects: <br /> Date of Eclipse Site Simpson Site <br /> Payment Per-Unit System Wide Proportionate Share Per-Unit System Wide Fee Proportionate Share <br /> Fee of Off-site of Off-site <br /> Improvements Improvements <br /> Before $351 per Unit $4,875 due with final $854 per Unit $14,300 due with final <br /> 6/2/2017 i <br /> "per unit"fee �'-- �--�— "per unit"fee payment <br /> payment <br /> On or after (0.39 trips x fee per trip $4,875 due with final (0.95 trips x fee per trip in $14,300 due with final <br /> 6/2/2017 in effect at payment) per "per unit" fee effect at payment) per "per unit" fee payment <br /> Unit payment Unit <br /> The proportionate share payment for signal improvements should be collected when the traffic mitigation fee for the <br /> last unit in each development are paid. These fees are not tied to inflation and will not change if they are paid after June <br /> 2, 2017 when the per-unit fee increases. <br /> If you have any further questions please let me know, <br /> EC L(pSz Tr-c, (tet rt-. <br /> Michael Brick, P.E. -pw / 0 91- 0227 <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> 2operfnie /ssuec/ <br /> 20 X 900 /8 DOD L&eletf <br /> 20 )( 8,5.4 = t - / 7 680 sh��a have <br /> itav, collet-led <br /> Pew <br /> Poritiipeel jhcere 9E0 ovev GcvtLede/ <br /> ® sft <br /> /4300 <br /> 9Z <br /> /3310 bM.Lamc o-ttPro , Ski reowe <br />