My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2019-03-14
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2019-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 11:41:05 AM
Creation date
3/14/2019 11:41:04 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br /> From: Michael Brick <br /> Sent: Friday,April 29, 2016 12:29 PM <br /> To: Kirk Brooks <br /> Subject: Polygon Riverfront (Eclipse and Simpson Sites)Traffic Mitigation Fees <br /> Kirk, <br /> I located the Traffic Impact Analysis by Transportation Engineering NorthWest for this project dated 6/16/2014. Based <br /> on their study I have figured out the per-unit and proportionate share fees for these projects. Here is a breakdown to <br /> the traffic mitigation fees due for the Polygon Riverfront projects: <br /> Date of Eclipse Site Simpson Site <br /> Payment Per-Unit System Wide Proportionate Share Per-Unit System Wide Fee Proportionate Share <br /> Fee of Off-site of Off-site <br /> Improvements Improvements <br /> Before $351 per Unit $4,875 due with final $854 per Unit $14,300 due with final <br /> 6/2/2017 i <br /> "per unit"fee �'-- �--�— "per unit"fee payment <br /> payment <br /> On or after (0.39 trips x fee per trip $4,875 due with final (0.95 trips x fee per trip in $14,300 due with final <br /> 6/2/2017 in effect at payment) per "per unit" fee effect at payment) per "per unit" fee payment <br /> Unit payment Unit <br /> The proportionate share payment for signal improvements should be collected when the traffic mitigation fee for the <br /> last unit in each development are paid. These fees are not tied to inflation and will not change if they are paid after June <br /> 2, 2017 when the per-unit fee increases. <br /> If you have any further questions please let me know, <br /> EC L(pSz Tr-c, (tet rt-. <br /> Michael Brick, P.E. -pw / 0 91- 0227 <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> 2operfnie /ssuec/ <br /> 20 X 900 /8 DOD L&eletf <br /> 20 )( 8,5.4 = t - / 7 680 sh��a have <br /> itav, collet-led <br /> Pew <br /> Poritiipeel jhcere 9E0 ovev GcvtLede/ <br /> ® sft <br /> /4300 <br /> 9Z <br /> /3310 bM.Lamc o-ttPro , Ski reowe <br />
The URL can be used to link to this page
Your browser does not support the video tag.