My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2019-03-14
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2019-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 11:41:05 AM
Creation date
3/14/2019 11:41:04 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICe <br /> A r, 6 0, <br /> 101 <br /> Michael Brick <br /> To: Gordon Witcher <br /> Subject: Simpson Site Updated Traffic M igation tangu.3e <br /> • DRAFT <br /> Gordon, <br /> Here is revised language for the Simpson site traffic mitigation. <br /> A system-wide traffic mitigation fee in accordance with EMC 18.40 shall be due -.r each dwelling unit upon issuance of <br /> its building permit. Per EMC this fee shall be based on the number f PM peak our trips generated by this project. Per <br /> the approved Traffic Impact Analysis provided by Transportation En ineering N. thWest(dated 6/16/2014)this project <br /> is anticipated to generate 0.95 PM peak hour trips per dwelling unit. -^= na -- ' .- <br /> _° this system-wide traffic <br /> mitigation fee shall be calculated according to the per-trip fee in effect at the ti `e of permit issuance as defined In EMC <br /> 18.40. <br /> A payment of the proportionate share of necessary traffic Improvements in acco dance with EMC 18.40 to mitigate <br /> location-specific impacts shall be due for this project upon issuance of the first b ilding permit. Per the approved Traffic <br /> Impact Analysis provided by Transportation Engineering NorthWest(dated 6/16 ►014)two locations require <br /> proportionate share payments. A payment of$11,375 for improvements at the I tersection of Pacific Ave and the <br /> Northbound 1-5 Off-Ramp,and a payment of$2,925 for improvements at the int:rsection of S 2"d Ave and Lenora St,is <br /> required to mitigate the location-specific impacts of this project. <br /> Michael Brick,P.E. <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> • <br /> DIR <br /> , tir cof-- <br /> Art,- <br /> 6P- - tie-- .�,,�- <br /> o o q y'c amt-r dit . ) 64(C411441 r v4‘Q l <br /> CC-C,-"e-;6°A1j rfb1°I <br /> f 4,^/ <br /> t 1 <br /> z117 ,/1-flu- ' ate. <br /> dcf) <br />
The URL can be used to link to this page
Your browser does not support the video tag.