My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2019-03-14
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2019-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 11:41:05 AM
Creation date
3/14/2019 11:41:04 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Impact Fees. If OM receives the permits and approvals necessary to develop the Project, <br /> it will pay the following impact fees: <br /> 9.1 Transportation Impact Fees. Chapter 18.40 EMC requires project applicants to <br /> prepare a traffic analysis that studies the amount of traffic to he generated by the project,the <br /> potential transportation effects of the project,and measures to avoid or otherwise mitigate <br /> adverse transportation effects. The code requires that traffic impact fees be collected for projects <br /> that generate more than 50 peak hour trips. A traffic analysis is included in the EIS for the <br /> Project which shows that the Project will generate more than 50 peak hour trips. OM will pay <br /> the traffic impact fees required by Ch. 18.40 EMC..In 2009 or 2010,the City may revise its <br /> transportation impact fees in Ch. 18.40 EMC. If it does,OM will pay the 2009/2010-revised fees <br /> for each new building prior to issuance of a building permit for each structure. The 2009/2010- <br /> revised fees shall apply to the Project for eight years from the date of this Agreement. If the City <br /> does not revise its transportation impact fees in Ch. 18.40 EMC in 2009 or 2010,OM will pay <br /> the fees in Ch. 18.40 EMC in effect on the date of this Agreement and these fees shall apply to <br /> the Project for eight years from the date of this Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.