Laserfiche WebLink
7A <br /> CERTIFICATE OF COMPLETION <br /> Project: Kasch Park Soccer Fields—Synthetic Turf Replacement Phase 2 <br /> Contractor: Premier Field Development <br /> Job Cost No. 049 <br /> The above-mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Parks and Recreation Department. <br /> The Contractor physically completed the project,within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> arks &Recreate ector Date <br /> Lori Cummings <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Cassie Franklin <br /> s:\#common\cip\49 kasch soccer\accounting\contract noticeslcertifn of completion:doc <br />