Laserfiche WebLink
8. City streets and alleys are to be kept clear of dirt and debris at all times during <br />construction. Dust suppression and street cleaning must occur as directed by the <br />Public Works Inspector. <br />9. A Performance Guarantee is required for street improvements on the Evergreen way _ <br />prior to any building permit being issued. <br />