Laserfiche WebLink
• COMcheck Software Version 4.0.8.1 <br /> Inspection Checklist <br /> Energy Code: 2015 IECC <br /> Requirements: 100.0% were addressed directly in the COMcheck software <br /> Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each <br /> requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception <br /> is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. <br /> Section <br /> # Plan Review Complies? Cornt(AA\Ssumptions <br /> & Req.ID AgOr <br /> C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. <br /> [PR3]1 calculations provide all information ❑Does Not <br /> with which compliance can be <br /> determined for the service water ENot Observable <br /> heating systems and equipment and ENot Applicable <br /> document where exceptions to the <br /> standard are claimed. Hot water <br /> system sized per manufacturer's <br /> ;sizing guide. <br /> C406 Plans, specifications, and/or ❑Complies !Requirement will be met. <br /> [PR9]' calculations provide all information ❑Does Not <br /> with which compliance can be <br /> determined for the additional energy ENot Observable <br /> efficiency package options. Observable,_, <br /> Applicable <br /> Additional Comments/Assumptions: <br /> 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: Red Wing Shoes Report date: 08/03/18 <br /> Data filename: G:\6440.85\Comcheck Compliance Reports\6440.everett.cck Page 2 of 6 <br />