Laserfiche WebLink
Section _- . <br /> # Plumbing Rough-In Inspection Complies? Comments/Assumptions <br /> & RegJD <br /> C404,5; !Heated water supply piping conforms ❑Complies Requirement will be met. <br /> C404.5.1, to pipe length and volume ❑Does Not <br /> C404.5.2 requirements. Refer to section details. <br /> (PL6]3 [Not Observable <br /> ❑Not Applicable <br /> C404.6.3 !Pumps that circulate water between a ❑Complies Requirement will be met. <br /> [PL7]3 heater and storage tank have controls ❑Does Not <br /> !that limit operation from startup to <br /> <= 5 minutes after end of heating ❑Not Observable <br /> cycle. ENot Applicable <br /> C404.7 !Water distribution system that pumps ❑Complies Requirement will be met, <br /> [PL8]3 'water from a heated-water supply ❑Does Not <br /> pipe back to the heated-water source <br /> !through a cold-water supply pipe is a ❑Not Observable <br /> demand recirculation water system. ❑Not Applicable <br /> !Pumps within this system have <br /> controls that start the pump upon <br /> receiving a signal from the action of a <br /> user of a fixture or appliance and <br /> limits the temperature of the water <br /> entering the cold-water piping to <br /> 1104°F. <br /> Additional Comments/Assumptions: <br /> 1 High Impact(Tier 1) ,2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: Red Wing Shoes Report date: 08/03/18 <br /> Data filename: G:\6440.85\Comcheck Compliance Reports\6440.everett.cck Page `3 of '6 ,\ <br />