• <br /> MIME <br /> WNW <br /> 15. Plan 1/AF1.1 shows a new GL5-1/8x16-1/2 beam spanning parallel with the existing joists. <br /> The purpose of and loading conditions on the beam are not clear. The beam does not appear <br /> to be included in the structural calculation package. Documentation substantiating its design <br /> should be submitted for review. See IBC Section 1604.1. <br /> DCI Response: See updated framing at the mezzanine in the updated drawings. <br /> 16. The elevator shaft appears to require headers for the door openings at all levels. Plans <br /> 2/AF1.1, 1/AF1.1, and 2/AF1.1 should be revised to include headers. Calculations <br /> substantiating the design of the headers should be submitted for review. See IBC <br /> Sections 1603.1, 1604.1, and 2304.3.2. <br /> DCI Response: The elevator addition has been removed from this project so these beams <br /> are no longer needed. <br /> 17. The design appears to require jamb studs at multiple locations to support beams. Locations <br /> include, but are not limited to, the elevator headers and the GL 3-1/8 in Plan 1/AF1.1.A detail <br /> should be added to the drawings. See IBC Section 1603.1. <br /> DCI Response: The mezzanine plan has been revised,these beams are no longer needed <br /> so the jamb studs are likewise not needed. <br /> 18. Plan 1/AF1.1 shows new GL5-1/8x12 headers that appear vertically-aligned under the existing <br /> floor sheathing to support the new 2x12 joists with face-mounted connections. It appears that <br /> similar connections will be required for the existing joists on the opposite face. The structural <br /> design should be reviewed and revised as needed. See IBC Section 1603.1. <br /> DCI Response: The mezzanine level landing at the elevator has been removed from this <br /> project. <br /> 19. Details and calculations should be provided for multiple framing connections to <br /> substantiated their design. See IBC Section 107.2.1 and 1604.1. Connections requiring <br /> additional documentation include, but are not limited to, the following: <br /> a. Plan 1/AF1.1: GL5-1/8x12 to wall framing and existing post. <br /> b. Plan 1/AF1.1: GL5-1/8x16-1/2 to existing exterior and interior walls. <br /> C. Plan 2/AF1.1: GL5-1/8x16-1/2 to existing exterior wall and existing beams. <br /> DCI Response: The framing scheme has changed such that there are no new connections <br /> to existing columns or exterior walls.The connections of the new stringers to the second <br /> level framing is shown in detail 6/AF1.1 and calculation sheet S4. <br /> 20.Detail 5/AF1.0 shows details for the connection of the elevation shaft to the existing roof <br /> framing. See IBC Sections 107.2.1 and 1603.1. The following comments should be <br /> addressed: <br /> a. The detail appears to indicate the existing joists are oriented in the north-south direction. <br /> However, based on the second-floor framing, it appears likely that the joists span east- <br /> west. The orientation should be verified and the connections on the north and south walls _ , <br /> revised as needed. <br />