Laserfiche WebLink
• <br /> 4 <br /> IIIIIII <br /> NMI <br /> IMII <br /> NMI <br /> b. Blocking appears to be provided between the existing joists to provide continuity with the <br /> roof diaphragm. Nailing requirements should be provided. in addition, it is not clear how <br /> the roof nailing will be performed through the existing roofing system;this should be <br /> clarified. <br /> C. The existing detail appears to generally represent conditions on the east and west wall, <br /> sans the hoist beam and post. The detail should be retained and revised as <br /> appropriate, and references added in Plan 2/AF1.0. <br /> d. The detail appears to require SDS screws for the full height of the post in addition to the <br /> six screws installed at the top. The note should be revised for clarity. <br /> DCI Response: An added elevator is no longer part of this project. <br /> 21. The design appears to have walls that cantilever from the floor system in multiple locations, <br /> including but not limited to the first story stairway, mezzanine lobby, and second story opening <br /> for the stairway. Details for the walls should be added to the drawings. Calculations <br /> substantiating that the walls satisfy the loading criteria of IBC Sections 1607.8.1 and <br /> 1607.8.1.1 should be submitted for review. See iBC Sections 1603.1 and 1604.1. <br /> DCI Response: An added elevator is no longer part of this project <br /> 22. The interaction of the east elevator shaft wall and the existing second floor framing in Plan <br /> 1/AF1.1 does not appear consistent with the west wall.A detail for the wall-to-floor connection <br /> should be included in the drawings. Calculations substantiating the connection should be <br /> submitted for review as needed. See IBC Section 107.2.1 and 1604.1. <br /> DCI Response: An added elevator is no longer part of this project <br /> Example Text: DCI Engineers has a proven track record for the design of efficient and cost effective structures <br /> and is well known for excellent client service. Because of this,much of our work has been with repeat clients, <br /> and we are the engineer of choice for several prominent developers and architects. Additionally,we pride <br /> ourselves in providing innovative solutions to construction projects. Our designs are cost effective and simple to <br /> construct. Our analytical approach has allowed our designs to be lighter and more construction friendly, <br /> corresponding to a savings in materials and schedule. By working closely in collaboration with the design team, <br /> developer and contractor,we work diligently to identify and select cost-effective solutions. This results in <br /> achieving project construction economy goals,as well as,fitting the project program. <br /> Thank you very much for this opportunity to present our statement of qualifications. We hope we can be of <br /> service to your engineering needs. <br /> Sincerely, <br /> DCI Eineers <br /> (A,17,)n; <br /> Craig A.Stainer,P.E.,S.E. <br /> (6,- <br /> Associate 7.0 <br />