Laserfiche WebLink
Bethany at Silver Lake <br /> Chapter 388-97 WAC Nursing Home <br /> 15 ❑x The Emergency Generator must be categorized by the Engineer to comply with NFPA 70-517 <br /> &700,NFPA 99-6,NFPA 101-18 &NFPA 110-4(Type 2). Provide/list the applicable <br /> categorization. <br /> 16Additional comments may arise upon CRS review of subsequent submittal materials. <br /> I <br /> ....._ .. . ..._ . . ...._- _- -- _. . _. _ ti.� _ �._......: ____�...__. .. ..:._. <br /> 17 Ei The response received on 8-7-18 contained NO written response, listed by comment#and the <br /> drawings received appeared the same as originally submitted(no apparent change). In fact,the <br /> drawing set(4 dwgs)received 6-27-18 was dated 5-16-18 and the drawing set(4 dwgs) <br /> received 8-7-18 was dated 4-23-18 and appear to be the same drawings(not sure why the <br /> August submittal was from the earlier dated version). Suggest contacting Senior Plans <br /> reviewer(KAS)Kevin A Scarlett at 360.688.0771 to discuss these and other concerns prior to <br /> your next submittal. <br /> Compliance with the comments above provided by the Department of Health,Construction Review Services,are necessary for this facility to meet the cited <br /> requirements of the applicable licensing regulations found in the Washington State Administrative Code and associated references. These comments, <br /> authorization to begin construction or final project approval do not relieve the facility from the responsibility to meet the requirements of any applicable <br /> federal,state or local regulations.In the event of conflicts between other jurisdictions and these written comments,the most stringent shall apply. The <br /> building owner or operator is ultimately responsible for safety and insuring the building is in compliance with all applicable laws. <br /> Page 6 of 6 Plan Review Comments for Project 60875836 <br />