Laserfiche WebLink
Bethany at Silver Lake <br /> Chapter 388-97 WAC Nursing Home <br /> El If the facility wishes to run on natural Provide a letter from the ga u <br /> 8 ty gas. natural gas supplier stating <br /> their fuel system is dependable/reliable and any history of interruption to the area. <br /> 2010 NFPA 110 5.1.1 <br /> Further comments may be made upon response to this question/response. <br /> I � <br /> 9 Provide a description of the generator� p g rator concrete pad(I.E.thickness,width&length)and how it <br /> will be seismically attached to the concrete pad. 2010 NFPA 110-5.1.2 and IBC 2015 <br /> Chapter 1604.1 Seismic codes. <br /> 10 . . ... ... 0 Provide the design for; WAC 38ry _. <br /> vi8-97-3420 <br /> > Concrete pad to support the weight of the full propane tank <br /> > Seismic tie down of the propone tank to the concrete pad. <br /> > Security design to prevent tampering with valves etc. on propane tank. <br /> > Protective bollards every four feet on center for the propane tank meeting 2015 IFC <br /> section 312 and 2015 IFC 6107.4 for vehicle impact protection <br /> > Section drawing of trench to provide sufficient depth for protection of the fuel lines. <br /> > Provision of warning placards for the propane tank per 2015 IFC 6107.2 <br /> > Provision of battery backed up lighting by the propane tank as part of the EPSS.This <br /> would also include the generator set. (May be mounted to the building wall in two <br /> I � <br /> locations if they provide sufficient illumination to check equipment.) <br /> 11 x❑ Vehicle impact protection bollards for the generator is required to be installed four feet on <br /> center and installed per 2010 NFPA 110 7.1.2&2015 IFC section 312 <br /> I j <br /> 12 ❑x The one line drawing appears to show a level 2 emergency power system per the base WAC <br /> 388-78 requirements. Confirm/provide a response to the following; WAC 388-78-3440 <br /> (A)It appears that panel P-X is the life safety panel; (Please confirm) <br /> > What is the 3 pole breaker(17/19/21)feed? <br /> > What does kitchen breaker#25 feed? <br /> (B) It appears that panel EM-2 is the equipment and any other emergency power needs <br /> panel? (Please confirm) <br /> (C) Provide confirmation that this nursing home does not receive or have patients on <br /> ventilators,requiring a level 1 EPSS. <br /> ._. ...=_»,;.- <br /> 13 0 Provide drawing information for the MUA and AHU panel electrical reconfigurations. <br /> j I WAC 388-78-3440 <br /> 14 0 Where is the existing enerator enunciator located and does it pick up all the required <br /> monitoring points that the new generator will have the capacity for? 2010 NFPA 99-6.4.1.1.17 <br /> I I i <br /> Page 5 of 6 Plan Review Comments for Project 60875836 <br />