Laserfiche WebLink
Bethany at Silver Lake <br /> Chapter 388-97 WAC Nursing Home <br /> Project Details (for internal use only) <br /> Occupancy Type Construction Type Fed Code:2012 NFPA 101 <br /> IBC: I-2 IBC: IBC: IBC: IBC: IBC: Building Code:2015 IBC <br /> NFPA 101: Healthcare NFPA 101: NFPA 101: Licensing Code: <br /> Number of Beds Added:N/A Removed: CON Required? ❑Yes ® No CON Approved ❑ Yes ❑ No <br /> Req'd Provided Type/category Are Hospital inpatients seen at this <br /> location? ❑ Yes ® No <br /> Automatic Fire Sprinkler System: Yes Yes 13 Are planned residents/patients incapable <br /> of self preservation?❑ Yes ❑ No <br /> Automatic Fire Alarm System: Yes Yes <br /> If yes,how many? <br /> Emergency Power System: Yes Yes Type 1 EES Is sedation provided? ❑ Yes ❑ No <br /> Medical Gas System: If yes,max.planned level? <br /> Smoke Compartmentation: Yes Yes Is space Medicare certified? <br /> ❑ Yes ® No <br /> Building Department contacted?Yes Estimated construction completion: <br /> Replace current generator with a 80KW generator outside of the southwest corner of building.Cut patch and dig ditch <br /> from building to generator for natural gas line.Then build cement pad for generator to be placed on.-kas <br /> O <br /> z <br /> For Assisted Living Facilities Only Total Sleeping rooms <br /> Minimum required area of day rooms/areas Total Approved beds <br /> Total area provided in day rooms/areas Total Contract beds <br /> O <br /> E— <br /> O <br /> Page 3 of 6 Plan Review Comments for Project 60875836 <br />