Laserfiche WebLink
Bethany at Silver Lake <br /> Chapter 388-97 WAC Nursing Home <br /> Plan Review Comments: <br /> Q <br /> ) <br /> 0 � <br /> c� <br /> d z <br /> General: <br /> 1 I] Contact CRS Senior Plans Reviewer Kevin A. Scarlett(KAS)at 360.236.2949 to schedule <br /> Inspection efforts. Plan one Initial and one Final Inspection(Initial-prior to project start and <br /> Final within 2 weeks of project completion). Inspection efforts will occur via GoToMtg Video <br /> medium,the Facility must contact KAS to set-up and coordinate with the applicable site <br /> personnel. This comment will remain `open' until construction is complete. <br /> I i <br /> 2_ ❑ Provide aa CRS Reviewer is not able to zoom-in to read detail on the drawings. <br /> El pdf set of plans <br /> which allow zoom-to-detail clarity. <br /> 3x❑ Suggest contacting Senior Plans reviewer(KAS)Kevin A Scarlett to discuss these and other <br /> concerns prior to your next submittal. <br /> Design: <br /> 4 x❑ I am not seeing various required elements such as Remote Stop,Weather protected stop, <br /> Secured from nuisance stop, 3 like keys(min)distributed as approved. <br /> Reference 2010 NFPA 110 5.6.5.6 <br /> 5 El Provide in the functional narrative the following per WAC 388-97-3420: <br /> (a) What size generator is the existing system and what fuel source was it running on <br /> previously. <br /> (b) While the generator is being switched out,new wiring,new transfer switch being <br /> installed. How is emergency power provided during that period of time, as emergency <br /> power is required to be available at all times? <br /> (c) Confirm that this project was not related to any citation as the application check box <br /> denoted. <br /> (d) What capacity is the new propane tank and how many run hours does it provide for the <br /> 80KW generator set? <br /> ❑ Dependent on the volume of Propane in the proposed 6 x p p p p ed tank, clearances to buildings,public <br /> ways or lot lines for adjacent properties will be evaluated against 2015 IFC Table 6104.3 <br /> minimum clearances. <br /> 7 El Provide a projected schedule for the setup of temporary emergency power, demo of the old <br /> generator, installation of the new and load bank testing of the new emergency power supply <br /> system. WAC 388-97-3420 <br /> Page 4 of 6 Plan Review Comments for Project 60875836 <br />