Laserfiche WebLink
PLANS PREPARED FOR: <br /> NOTES: <br /> 1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILAY TO COORDINATE WITH THE PROPERTY OWNER & <br /> NECESSARY UTILITY COMPANIES FOR THE LOCATION OF ALL EXISTING BELOW GRADE UTILITIES Sprint <br /> PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE <br /> COSTS ASSOCIATED WITH EXISTING BELOW GRADE UTILITIES <br /> 2. CONTRACTOR TO NOTE POTENTIAL INTERFERENCES WITH EXISTING UTILITIES AND HAND DIG INSIDE SITE: PANEL NAME: PPC <br /> FENCED COMPOUND AND IN VICINITY OF ALL UTILITY CROSSINGS 120/240 Vac PANEL STATUS: NEW PROJECT MANAGER: <br /> VOLTAGE: <br /> 3. CONTRACTOR SHALL FURNISH, INSTALL AND UPGRADE ALL ELECTRICAL MATERIALS REQUIRED FOR PHASE: 1 ENCLOSURE TYPE: NEMA 3R Total kVA 15.76 <br /> INSTALLATION <br /> WIRE: 3W MOUNT: SURFACE <br /> 4. PROPOSED UTILITY ROUTING SHALL BE APPROVED BY UTILITY COMPANIES PRIOR TO START OF BUSS RATING: 100 AID 22kA Total AMPS 65.65 • <br /> CONSTRUCTION AND IS SUBJECT TO CHANGE. COORDINATION WITH UTILITIES BY OTHERS <br /> MAIN BREAKER: 100 PANEL POSITIONS: 24 10590 WEST OCEAN AIR DRIVE <br /> SUITE 300 <br /> CKT LOAD DESCRIPTION BREAKER BREAKER BREAKER SERVICE USAGE PhaseA Phases USAGE SERVICE BREAKER BREAKER BREAKER SAN DIEGO, CA 92130 <br /> NAI (VA) LOAD DESCRIPTION CKT PLANS PREPARED BY: <br /> AMPS POLES STATUS LOAD FACTOR 59.58A 71.7SA FACTOR LOAD STATUS POLES AMPS <br /> 1 EQUIPMENTCABINET(ECAB) 100 2 ON 6000 1 6000 1500 1 1500 ON 1 20 BATTERYCABINET(BCAS) 2 FULLEI2TON <br /> 3 6000 1 625 6000 1.25 500 ON 1 20 SERVICE UGHT 4 ENGINEERING DESIGN <br /> 5 0 0 6 <br /> 7 0 0 8 I I00 E E WOMBURGDILLINOISROAD, <br /> 60�500 <br /> 9 0 0 <br /> 10 TEL 847-908-8400 <br /> ly COA#3I S I <br /> TO POWER SOURCE-- 14,1 <br /> 11 0 0 12 www.FullertonEngineering.com <br /> i 13 0 0 <br /> 14 <br /> -.ENGINEERING LICENSE&SEAL <br /> W 15 0 0 16 I HEREBY CERTIFY THAT THESE DRAWINGS WERE <br /> NEW 1/2"C W/(2) 12 AND I 17 0 1080 1 1080 ON 1 20 GFCI PREPARED BY ME OR UNDER MY DIRE <br /> 18 SUPERVISION AND CONTROL, AND TO THE CT BEST <br /> (1) #12 GND FROM PPC TO SCAB OF MY KNOWLEDGE AND 19 500 0 1 500 ON 1 15 TELCO FAN 20 THE REQUIREMENTS OF ALL EAPPL APPLIUEF CABLE CODES. <br /> Y WITH <br /> NEW 3/4" C W/ 4 PR 24 GA I 21 0 25 1 25 ON 2 60 SURGE ARRESTOR 22 <br /> CAT-5E FOR SURGE ARRESTOR I 23 25 0 1 25 24 6E1,44 <br /> ALARM FROM PPC TO ECAB W <br /> �Q��'pF WASf���,1, <br /> � <br /> v 3 3 !V '.' O� q <br /> NEW 2" C W(3) #2 AND - n- <br /> (1) #8 GND FROM PPC TO ECAB �� POWER b T �',, <br /> _ _ Ii li TEL <br /> W _, EGrI °/tt,� <br /> / \ J <br /> L // AC PANEL SCHEDULE SCALE: N.T.S. 2 S`S/ONALI:�' <br /> _ I <br /> \\ 7i W NOTE: <br /> \ / DRAWING NOTICE: <br /> \ \ / / / CONTRACTOR TO COORDINATE METER PPC PANEL THESE DOCUMENTS ARE CONFIDENTIAL AND ARE <br /> \ \ \ // RELOCATION WITH UTILITY COMPANY THE SOLE PROPERTY OF SPRINT AND MAY NOT BE <br /> \ TO REMOTE TO POWER REPRODUCED,DISSEMINATED OR REDISTRIBUTED <br /> ® ®') I" _ _ / W GENERATOR - SOURCE WITHOUT THE EXPRESS WRITTT() <br /> EN CONSENT Of <br /> POWER CONNECTIONS SPRINT. <br /> NEW SPRINT CABINET SOURCE MOGUL SOCKET MOUNTING REVISIONS: <br /> EXISTING CONDUIT \ / DESCRIPTION DATE BY REV <br /> AND CONDUCTORS \ V QUARTZ FL DOLIGHT <br /> w TO BE EXTENDED -PIPE CAP <br /> ECRB BCAB M FROM EXISTING TO LOAD CENTER - <br /> n ® co ® ® I W NEW METER LOCATION (INTERNAL TO PPC) 100A) t00A) <br /> / ' MECHANICAL \ [REV 0 7/10/18 MH 0 <br /> m EV B6/28/18 MH B <br /> (E) RELOCATED NEMA (E) SUER BCKMANUFACTURERS CABLE OR OTHER CABLEw 3R METER �� SPRINT INTERLOCK SUITABLE FOR EX1T7rDED SUNLIGHT EXPOSUREEV A 5/11/18 PD A <br /> / - y 100A/2P ' " /' 20A/1P <br /> C / / 8 METER \ O °-o ° METALLIC CABLE TERMINATION FITTING <br /> ISFFECAS <br /> CAGEID: <br /> � J (E) RELOCATED METER, ��\ /-\ 20A/1 P <br /> W 0 ' LABELED "SPRINT" °�' ° 3.0 STD (3.5" 00) HOT DIP GALVANIZED <br /> \ W ZLa <br /> o <br /> STEEL POST SE52XC205 <br /> I 1/2-c, #6 AWG o o o WEATHER PROOF 60 MIN. ROTARY <br /> x TIMER LIGHT SWITCH '� -� SITE NAME: <br /> W W SERVICE GROUND (MIN.) O—o o B <br /> Cc - L W • c-- �1 3/4" RGS CONDUIT FOR ' PORT GARDNER <br /> 2 — 0 °- 0 0 <br /> 3#12 ELECTRICAL RUN <br /> T \ c� ® SITE ADDRESS: <br /> 9 --o <br /> n EXOTHERMIC WELD <br /> 2599 MADISON ST. <br /> NEW WORK LIGHT ° °-O ° EVERETT,WA 98203 <br /> 1-1/4"C W/ o�O o 20A/1P* <br /> (3) #2 AWG (MIN.) o 15A/1 P* #2 AWG BARE SOLID TINNED COPPER PROJECT: <br /> 3/4" C W/(2) #12 AND '-AND (1) #8 GND (MIN.) (BSTCW) TO GROUND RING <br /> (1)•#12 GND FROM PPC TO ' 7--- 60A/2P* DO MACRO AND <br /> WORK LIGHT °-O ° / TO NEW POWER PROTECTION CABINET <br /> NEW POWER PROTECTION °�° -°��-' �__-.a MIMO UPGRADE <br /> CABINET (PPC) WITH ` SHEET DESCRIPTION: <br /> INTERNAL 24 POSITION NOTES: <br /> LOAD CENTER AND 1. (*) FACTORY INSTALLED. ALL OTHER C/B TO BE \1 ELECTRICAL DETAILS <br /> INTEGRATED CONNECTIONS FURNISHED AND INSTALLED BY CONTRACTOR. <br /> FOR REMOTE GENERATOR 2. CONTRACTOR SHALL REMOVE THE FACTORY <br /> INSTALLED NEUTRAL-GROUND BOND IN THE PPC. <br /> DWG INFORMATION: SHEET NUMBER: <br /> DRAWN BY: I MH E 1 <br /> TYPICAL CABINET UTILITY PLAN SCALE: N.T.S. 'I SINGLE LINE DIAGRAM SCALE: N.T.S. 3 WORK LIGHT DETAIL SCALE: N.T.S. 4 CHECKED BY: ST <br /> PROJECT# 2018.0128.0033 <br />