Laserfiche WebLink
. , " <br /> THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE PLANS PREPARED FOR: <br /> CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE PERFORMED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR MEETING THE <br /> REQUIREMENTS OF SPRINT'S "STANDARD CONSTRUCTION SPECIFICATIONS FOR WIRELESS SITES" IN REGARDS TO ALL WORK COMPLETED. <br /> spruiiit <br /> SECTION 01 100 - SCOPE OF WORK ALTERNATES:SECTION 01 400 - SUBMITTALS & TESTS REMOTE ELECTRICAL TILT (RET) CABLES: <br /> PROJECT MANAGER: <br /> THE WORK: AT THE COMPANY'S REQUEST, ANY ALTERNATIVES TO THE MATERIALS OR METHODS MISCELLANEOUS; <br /> SHALL COMPLY WiTH APPLICABLE NATIONAL CODES AND STANDARDS, LATEST EDITION, SPECIFIED SHALL BE SUBMITTED TO SPRINTS CONSTRUCTION MANAGER FOR INSTALL SPUTTERS, COMBINERS, FILTERS PER RF DATA SHEET, FURNISHED BY <br /> AND PORTIONS THEREOF. APPROVAL. SPRINT WILL REVIEW AND APPROVE ONLY THOSE REQUESTS MADE IN SPRINT. <br /> WRITING. NO VERBAL APPROVALS WILL BE CONSIDERED, ANTENNA INSTALLATION; <br /> PRECEDENCE; THE CONTRACTOR SHALL ASSEMBLE ALL ANTENNAS ONSITE IN ACCORDANCE WITH <br /> SHOULD CONFLICTS OCCUR BETWEEN THE STANDARD CONSTRUCTION SPECIFICATIONS THE INSTRUCTIONS SUPPLIED BY THE MANUFACTURER. ANTENNA HEIGHT, AZIMUTH, 10590 WEST OCEAN AIR DRIVE <br /> FOR WIRELESS SITES INCLUDING THE STANDARD CONSTRUCTION DETAILS FOR TESTS AND INSPECTIONS: AND FEED ORIENTATION INFORMATION SHALL BE A DESIGNATED ON THE SUITE 300 <br /> WIRELESS SITES AND THE CONSTRUCTION DRAWINGS, INFORMATION ON THE CONSTRUCTION DRAWINGS. SAN DIEGO, CA 92130 <br /> CONSTRUCTION DRAWINGS SHALL TAKE PRECEDENCE. <br /> A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION TESTS, PLANS PREPARED BY: <br /> SiTE FAMILIARITY; INSPECTIONS AND PROJECT DOCUMENTATION. A. THE CONTRACTOR SHALL POSITION THE ANTENNA ON TOWER PIPE MOUNTS SO <br /> THAT THE BOTTOM STRUT IS LEVEL THE PIPE MOUNTS SHALL BE PLUMB TO FULLEIZTON <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH ALL <br /> CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING B. CONTRACTOR SHALL ACCOMPLISH TESTING INCLUDING BUT NOT LIMITED TO THE WITHIN <br /> WITH CONSTRUCTION. FOLLOWING: <br /> 1 DEGREE. ENGINEERING DESIGN <br /> ON—SITE SUPERVISION; 1. COAX SWEEPS AND FIBER TESTS PER THE CURRENT VERSION OF SPRINT B. ANTENNA MOUNTING REQUIREMENTS: PROVIDE ANTENNA MOUNTING HARDWARE 1100 E.WOODFIELD ROAD,SUITE 500 <br /> THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE TS-0200 ANTENNA UNE ACCEPTANCE STANDARDS. AS INDICATED ON THE DRAWINGS. SGHAUMBURG,ILLINOIS 60173 <br /> RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND TEL 847-908-8400 <br /> PROCEDURES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 2. AGL, AZIMUTH AND DOWNTILT PROVIDE AN AUTOMATED REPORT UPLOADED TO JIYBRID CABLE INSTALLATION; COA#3151 <br /> A. THE CONTRACTOR SHALL ROUTE, TEST, AND INSTALL ALL CABLES AS INDICATED W W.FuIIertonEngineeringcom <br /> SNTENN USING A COMMERCIAL MADE—FOR THE PURPOSE ELECTRONIC ON THE CONSTRUCTION DRAWINGS AND IN ACCORDANCE WITH THE <br /> DRAWINGS. SPECIFICATIONS AND DETAILS REQUIRED AT JOBSTTE; ANTENNA ALIGNMENT TOOL (MT). INSTALLED AZIMUTH, CENTERLINE AND MANUFACTURER'S RECOMMENDATIONS. —ENGINEERING LICENSE 8 SEAL• <br /> THE CONSTRUCTION CONTRACTOR SHALL MAINTAIN A FULL SET OF THE DOWNTILT MUST CONFORM WITH RF CONFIGURATION DATA I HEREBY CERTIFY THAT THESE DRAWINGS WERE <br /> CONSTRUCTION DRAWINGS AT THE JOBSITE FROM MOBILIZATION THROUGH PREPARED BY ME OR UNDER MY DIRECT <br /> CONSTRUCTION COMPLETION. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL CORRECTIONS TO B. THE INSTALLED RADIUS OF THE CABLES SHALL NOT BE LESS THAN THE SUPERVISION AND CONTROL, AND TO THE BEST <br /> ANY WORK IDENTIFIED AS UNACCEPTABLE IN SITE INSPECTION ACTIVITIES MANUFACTURER'S SPECIFICATIONS FOR BENDING RADII. OF MY KNOWLEDGE AND BEUEF COMPLY WITH <br /> A. DETAILS ARE INTENDED TO SHOW DESIGN INTENT. PROVIDE AU. MATERIALS AND AND/OR AS A RESULT OF TESTING. THE REQUIREMENTS OF ALL APPLICABLE CODES. <br /> LABOR AS REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM. C. EXTREME CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE CABLES DURING <br /> MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS, AND 4. AU. TESTING REQUIRED BY APPLICABLE INSTALLATION MOPS. HANDUNG AND INSTALLATION. A., BBLL4 <br /> SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. OT WAsy�M y <br /> C. REQUIRED CLOSEOUT DOCUMENTATION INCLUDES, BUT IS NOT UNITED TO THE 1. FASTENING MAIN HYBRID CABLES: ALL CABLES SHALL BE INSTALLED INSIDE MONOPOLE WITH CABLE w� �•' G,,4 <br /> B. CONTRACTOR SHALL NOTIFY SPRINT CONSTRUCTION MANAGER OF ANY VARIATIONS FOLLOWING; SUPPORT GRIPS AS REQUIRED BY THE MANUFACTURER. �� (.• o� y <br /> PRIOR TO PROCEEDING WITH THE WORK.DIMENSIONS SHOWN ARE TO FINISH <br /> SURFACES UNLESS NOTED OTHERWISE. MODIFICATIONS MAY BE REQUIRED TO SUIT 1. AZIMUTH, DOWNTILT, AGL FROM SUNSIGHT INSTRUMENTS — ANTENNAUGN 2. FASTENING INDMDUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE (MEDUSA), WiTHIN <br /> JOB DIMENSIONS OR CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED ALIGNMENT TOOL (MT) THE MMBS CABINET AND ANY INTERMEDIATE DISTRIBUTION BOXES: � s'i� <br /> AS PART OF THE WORK. ' <br /> C. MARK THE FIELD SET OF DRAWINGS IN RED, DOCUMENTING ANY CHANGES FROM 2. SWEEP AND FIBER TESTS a. FIBER: SUPPORT FIBER BUNDLES USING Ti" VELCRO STRAPS OF THE REQUIRED LENGTH 0 i O�~' 's-m.GII 0' <br /> THE CONSTRUCTION FIELD <br /> SET DOCUMENTS.DRAWL 18' OC. STRAPS SHALL BE UV, OIL AND WATER RESISTANT AND SUITABLE FOR INDUSTRIAL S! <br /> 3. SCALABLE BARCODE PHOTOGRAPHS OF TOWER TOP AND INACCESSIBLE INSTALLATIONS AS MANUFACTURED BY TEXTOL OR APPROVED EQUAL pNAL C" <br /> SERIALIZED EQUIPMENT <br /> METHODS OF PROCEDURE (MOPS) FOR CONSTRUCTION: 4. ALL AVAILABLE JURISDICTIONAL PERMIT AND OCCUPANCY INFORMATION b. DC: SUPPORT <br /> BLACKBNYLONN,, WITH TWITH ENSILEES STRENGTH ADEQUATE <br /> i12000 PSIASZMANUFACTURED BYADRAWING NOTICE: <br /> CONTRACTOR SHALL PERFORM WORK AS DESCRIBED IN NELCO PRODUCTS OR EQUAL THESE DOCUMENTS ARE CONFIDENTIAL AND ARE <br /> 5. PDF SCAN OF REDUNES PRODUCED IN FIELD THE SOLE PROPERTY OF SPRINT AND MAY NOT BE <br /> A. COAX COLOR CODING SWEEPS AND FIBER TESTING TS-0200 AND EL-0568 3. FASTENING JUMPERS: SECURE JUMPERS TO THE SIDE ARMS OR HEAD FRAMES USING STAINLESS REPRODUCED,DISSEMINATED OR REDISTRIBUTED <br /> 6. A PDF SCAN OF REDLINE MARK—UPS SUITABLE FOR USE IN ELECTRONIC STEEL TIE WRAPS OR STAINLESS STEEL BUTTERFLY CUPS. WITHOUT THE EXPRESS WRITTEN CONSENT OF <br /> B. CABLE LABELING EN-2012-00 AS—BUILT DRAWING PRODUCTION SPRINT. <br /> 4. CABLE INSTALLATION: <br /> REVISIONS: <br /> C. APPLICABLE INSTALLATION MOPS IDENTIFIED ELSEWHERE IN THE CONTRACT 7. UEN WAIVERS DESCRIPTION DATE BY REV <br /> DOCUMENTS a. INSPECT CABLE PRIOR TO USE FOR SHIPPING DAMAGE, NOTIFY THE CONSTRUCTION MANAGER. <br /> 8. FINAL PAYMENT APPLICATION <br /> D. SPRINT GROUNDING SPECIFICATION NE-312-201 b. CABLE ROUTING: CABLE INSTALLATION SHALL BE PLANNED TO ENSURE THAT THE LINES WILL <br /> 9. REQUIRED FINAL CONSTRUCTION PHOTOS BE PROPERLY ROUTED IN THE CABLE ENVELOP AS INDICATED ON THE DRAWINGS. AVOID <br /> E. SPRINT INTEGRATED CONSTRUCTION STANDARDS VERSION 4.0 TWISTING AND CROSSOVERS. REV 0 7/10/18 MH 0 <br /> 10. CONSTRUCTION AND COMMISSIONING CHECKLIST COMPLETE WiTH NO DEFICIENT REV B 6/28/18 NH B <br /> SECTION 01 200 - COMPANY FURNISHED MATERIAL AND ITEMS C. HOIST CABLE USING PROPER HOISTING GRIPS. DO NOT EXCEED MANUFACTURES RECOMMENDED REV A 5/11/18 PD A <br /> EQUIPMENT MAXIMUM BEND RADIUS. <br /> 11. APPLICABLE POST NTP TASKS INCLUDING DOCUMENT UPLOADS COMPLETED IN <br /> [SITE CASCADE ID: <br /> COMPANY SITERRA (SPRINTS DOCUMENT REPOSITORY OF RECORD). 5. GROUNDING OF TRANSMISSION LINES: ALL TRANSMISSION UNES SHALL BE GROUNDED AS INDICATED <br /> SHEET IN THE NCONSTRUCTIO DISHED MATERIAL RAWINEGQSUIPMENT IS IDENTIFIED ON THE RF DATA 12. CLOSEOUT PHOTOGRAPHS AND CLOSEOUT CHECKLIST: SPRINT WILL PROVIDE ON DRAWINGS. SESZXCZOS <br /> SEPARATE GUIDANCE 6. HYBRID CABLE COLOR CODING: ALL COLOR CODING SHALL BE AS REQUIRED IN THE CURRENT <br /> VERSION OF SPRINT TS-0200. <br /> CONTRACTOR IS RESPONSIBLE FOR SPRINT PROVIDED MATERIAL AND EQUIPMENT TO SITE NAME <br /> ENSURE IT IS PROTECTED AND HANDLED PROPERLY THROUGHOUT THE CONSTRUCTION SECTION 11 700 - ANTENNA ASSEMBLY. REMOTE 7. HYBRID CABLE LABELING: INDMDUAL HYBRID AND DC BUNDLES SHALL BE LABELED <br /> DURATION. RADIO UNITS AND CABLE INSTALLATION ALPHA—NUMERICALLY ACCORDING TO SPRINT CELL SITE ENGINEERING NOTICE — EN 2012-001, PORT GARDNER <br /> REV 1 <br /> CONTRACTOR RESPONSIBLE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELL SUMMARY: <br /> WEATHERPROOFING EXTERIOR CONNECTORS AND HYBRID CABLE GROUND KITS; SITE ADDRESS: <br /> SITE OR CONTRACTORS LOCATION. CONTRACTOR TO COMPLETE SHIPPING AND THIS SECTION SPECIFIES INSTALLATION OF ANTENNAS, RRU'S, AND CABLE A. ALL FIBER & COAX CONNECTORS AND GROUND KITS SHALL BE 2599 MADISON ST. <br /> RECEIPT DOCUMENTATION IN ACCORDANCE WiTH COMPANY PRACTICE. EQUIPMENT, INSTALLATION, AND TESTING OF COAXIAL FIBER CABLE. WEATHERPROOFED. <br /> SECTION 01 300 - CELL SITE CONSTRUCTION EVERETT,WA 98203 <br /> ANTENNAS AND RRU'S; B. WEATHERPROOFED USING ONE OF THE FOLLOWING METHODS. ALL PROJECT: <br /> THE NUMBER AND TYPE OF ANTENNAS AND RRU'S TO BE INSTALLED IS DETAILED INSTALLATIONS MUST BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S <br /> NOTICE TO PROCEED; ON THE CONSTRUCTION DRAWINGS. RECOMMENDATIONS AND INDUSTRY BEST PRACTICES. DO MACRO AND <br /> NO WORK SHALL COMMENCE PRIOR TO COMPANY'S WRITTEN NOTICE TO PROCEED <br /> AND THE ISSUANCE OF WORK ORDER. HYBRID CABLE; 1. COLD SHRINK: ENCOMPASS CONNECTOR IN COLD SHRINK TUBING AND PROVIDE A DOUBLE WRAP MIMO UPGRADE <br /> HYBRID CABLE WILL BE DC/FIBER AND FURNISHED FOR INSTALLATION AT EACH OF 2' ELECTRICAL TAPE EXTENDING 2° BEYOND TUBING. PROVIDE 3M COLD SHRINK CXS SERIES <br /> SITE CLEANLINESS: SITE. CABLE SHALL BE INSTALLED PER THE CONSTRUCTION DRAWINGS AND THE OR EQUAL [SHEET DESCRIPTION: <br /> CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL, APPLICABLE MANUFACTURER'S REQUIREMENTS. <br /> DEBRIS, AND TRASH. AT THE COMPLETION OF THE WORK, CONTRACTOR SHALL 2. SELF—AMALGAMATING TAPE: CLEAN SURFACES. APPLY A DOUBLE WRAP OF SELF—AMALGAMATING SPRINT <br /> REMOVE FROM THE SiTE ALL REMAINING RUBBISH, IMPLEMENTS, TEMPORARY JUMPERS AND CONNECTOR; TAPE 2' BEYOND CONNECTOR. APPLY A SECOND WRAP OF SELF—AMALGAMATING TAPE IN OPPOSITE <br /> FACIUTIES, AND SURPLUS MATERIALS. FURNISH AND INSTALL 1/2" COAX JUMPER CABLES BETWEEN THE RRU'S AND DIRECTION. APPLY DOUBLE WRAP OF 2° WIDE ELECTRICAL TAPE EXTENDING 2' BEYOND THE SPECIFICATIONS <br /> ANTENNAS. JUMPERS SHALL BE TYPE LDF 4, FLC 12-50, CR 540, OR FXL 540. SELF—AMALGAMATING TAPE. <br /> SUPER—FLEX CABLES ARE NOT ACCEPTABLE. JUMPERS BETWEEN THE RRU'S AND <br /> DWG NFORMAnoN: SHEET NUMBER: <br /> ANTENNAS OR TOWER TOP AMPLIFIERS SHALL CONSIST OF 1/2 INCH FOAM 3. 3M SLIM LOCK CLOSURE 716: SUBSTITUTIONS WILL NOT BE ALLOWED. [DRAWN <br /> SH <br /> DIELECTRIC, OUTDOOR RATED COAXIAL CABLE, MIN LENGTH FOR JUMPER SHALL 4. OPEN FLAME ON JOB SITE IS NOT ACCEPTABLE CHECKED BY: ��� 1 <br /> BE 10"—O". BY: ST 1 <br /> PROJECT# 2018.0128.0033 <br /> r <br />