Laserfiche WebLink
RI. Lj \ Permit#: M1811-121 <br /> Sit ress: 1722 W MARINE VIEW DR <br /> NOV <br /> 018 O ftJ. EVEREIT PORT OF <br /> '-� ' i� Tenant: ANTHONYS WOODFIRE GRILL <br /> App. Date: 11/30/2018 <br /> EVERELI <br /> L <br /> FROSTRAIL INSrAttATION PDesperriiptionse. NSTALLREFRIGERATIONFOR BAR TOP <br /> FROST RAIL <br /> PLEASE DO NOT DFV A`i <br /> INSTALLING FROST RAILS ON ;AR TOP: <br /> 1 ) . Always use templates first to lay out the hole pattern <br /> on bar top. <br /> 2) . Position templates on bar top so that hole <br /> penetrations do not fall on the ?edge of the bar die <br /> wall. Try to avoid drilling holes over studs or <br /> obstacles in bar die wall. <br /> 3) . Caulk holes in bottom of FRails before setting on bar. <br /> 4) . When rails butt together, be sure that the male tab <br /> slides completely under the next ra too, just above <br /> the end cap. <br /> 5) . Make sure that the FRails are eve!, both left to right <br /> and to oack. <br /> 6) . Use shim material that is provided in installation kit to <br /> level FRails. <br /> 7) . When bolting FRails down to bar top, make sure <br /> that the joints are :-igntiy butted toge . <br /> 8) . After rails are bolted down, check for level again <br /> then use grey silicon provided in installation kit to <br /> caulk the sides of the modular butt joints. <br /> 9) . Talk with owner of establishment and set the Defrost <br /> Timer to urn on an hour before opening & off after <br /> closing Please show them how to operate this <br /> device & insure that its time is set correctly. <br /> CITY OF EVERETT6 l3 ) <br /> REVIEWED FOR PERM1 fon\LP <br />