My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1722 W MARINE VIEW DR WOODFIRE GRILL 2019-03-28
>
Address Records
>
W MARINE VIEW DR
>
1722
>
WOODFIRE GRILL
>
1722 W MARINE VIEW DR WOODFIRE GRILL 2019-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 10:04:38 AM
Creation date
3/28/2019 10:04:31 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1722
Tenant Name
WOODFIRE GRILL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RI. Lj \ Permit#: M1811-121 <br /> Sit ress: 1722 W MARINE VIEW DR <br /> NOV <br /> 018 O ftJ. EVEREIT PORT OF <br /> '-� ' i� Tenant: ANTHONYS WOODFIRE GRILL <br /> App. Date: 11/30/2018 <br /> EVERELI <br /> L <br /> FROSTRAIL INSrAttATION PDesperriiptionse. NSTALLREFRIGERATIONFOR BAR TOP <br /> FROST RAIL <br /> PLEASE DO NOT DFV A`i <br /> INSTALLING FROST RAILS ON ;AR TOP: <br /> 1 ) . Always use templates first to lay out the hole pattern <br /> on bar top. <br /> 2) . Position templates on bar top so that hole <br /> penetrations do not fall on the ?edge of the bar die <br /> wall. Try to avoid drilling holes over studs or <br /> obstacles in bar die wall. <br /> 3) . Caulk holes in bottom of FRails before setting on bar. <br /> 4) . When rails butt together, be sure that the male tab <br /> slides completely under the next ra too, just above <br /> the end cap. <br /> 5) . Make sure that the FRails are eve!, both left to right <br /> and to oack. <br /> 6) . Use shim material that is provided in installation kit to <br /> level FRails. <br /> 7) . When bolting FRails down to bar top, make sure <br /> that the joints are :-igntiy butted toge . <br /> 8) . After rails are bolted down, check for level again <br /> then use grey silicon provided in installation kit to <br /> caulk the sides of the modular butt joints. <br /> 9) . Talk with owner of establishment and set the Defrost <br /> Timer to urn on an hour before opening & off after <br /> closing Please show them how to operate this <br /> device & insure that its time is set correctly. <br /> CITY OF EVERETT6 l3 ) <br /> REVIEWED FOR PERM1 fon\LP <br />
The URL can be used to link to this page
Your browser does not support the video tag.